Orange County NC Website
This project will be submitted as a reprioritized highway project to be considered for inclusion <br /> in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 9 Park-and-Ride Improvements in Hillsborough (Conceptual): Implement park-and-ride <br /> vic <br /> improvements in Hillsborough for cross-county, fixed-route sere between Mebane and <br /> Durham. <br /> This project will be submitted as a new transit project to the DCHC MPO for consideration of <br /> inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The <br /> project's official submission must be made by Triangle Transit. <br /> 10 Hillsborough Train Station: Construct a train station in Hillsborough and implement AMTRAK <br /> service. <br /> This project will be submitted as a new transit/rail project by Triangle Transit for consideration <br /> of inclusion in the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 11 Eno Mountain Road/Mayo Street at Orange Grove Road: Realign the intersection of Eno <br /> Mountain Road (SR 1148) and Mayo Street (SR 1192) with Orange Grove Road (SR 1006) <br /> and make safety improvements. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 12 Homestead Road Bike Lanes and Sidewalks: Improve Homestead Road (SR 1777) from Old <br /> NC 86 (SR 1009) to NC 86 to include bicycle lanes and sidewalks in sections of the corridor <br /> where they do not exist. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 13 Buckhorn Economic Development District (EDD) Park-and-Ride: Construct a park-and-ride <br /> facility to be located in the 1-85/Buckhorn Road EDD. <br /> This project will be submitted as a new transit project by Triangle Transit or the Piedmont <br /> Authority for Regional Transportation (PART) for consideration of inclusion in the DCHC MPO <br /> regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 14 1-40 Widening: Widen 1-40 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to <br /> the Durham County line. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 15 1-85 Widening: Widen 1-85 from four (4) lanes to six (6) lanes from the 1-40/1-85 interchange to <br /> the Durham County line. <br /> This project will be submitted as a reprioritized highway project for consideration of inclusion in <br /> the DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. <br /> 16 Trail Connection from Patriot's Pointe to Timbers Drive: Construct a multi-use path connecting <br /> the southwest corner of Patriots Pointe to Timbers Drive to shorten walking distances for <br /> pedestrians. <br /> This project will be submitted as a new pedestrian project for consideration of inclusion in the <br /> DCHC MPO regional priority list and MTIP as well as the 2016-2022 STIP. The project will be <br />