Browse
Search
1996 S Housing - Owner and Coulter, Hart Jewell Thames PA Engineering Services Consultant
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1996
>
1996 S Housing - Owner and Coulter, Hart Jewell Thames PA Engineering Services Consultant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 9:06:25 AM
Creation date
11/19/2013 4:02:11 PM
Metadata
Fields
Template:
BOCC
Date
12/17/1996
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8b
Document Relationships
Agenda - 12-17-1996 - 8b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1996\Agenda - 12-17-1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Limitations of Authority. <br /> The Resident Project Representative: <br /> 1. Shall not authorize any deviation from the Contract Documents or <br /> substitution of materials or equipment, unless authorized by the <br /> ENGINEER. <br /> 2. Shall not exceed limitations of the ENGINEER's authority as set <br /> forth in the Contract Documents. <br /> 3. Shall not undertake any of the responsibilities of the Contractor, <br /> subcontractors or Contractor's superintendent. <br /> 4. Shall not advise on, issue directions relative to or assume control <br /> over any aspect of the means, methods, techniques, sequences or <br /> procedures of construction unless such advice or directions are <br /> specifically required by the Contract Documents. <br /> 5. Shall not advise on, issue directions regarding or assume control <br /> over safety precautions and programs in connection with the work. <br /> 6. Shall not accept Shop Drawing or sample submittals from anyone other <br /> than the Contractor. <br /> 7. Shall not authorize the OWNER to occupy the Project in whole or in <br /> part. <br /> 8. Shall not participate in specialized field or laboratory tests or <br /> inspections conducted by others except as specifically authorized by , <br /> the ENGINEER. <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.