Browse
Search
Agenda - 12-17-1996 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 12-17-1996
>
Agenda - 12-17-1996 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 12:40:17 PM
Creation date
11/19/2013 12:40:13 PM
Metadata
Fields
Template:
BOCC
Date
12/17/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
1996 S Housing - Owner and Coulter, Hart Jewell Thames PA Engineering Services Consultant
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
Minutes - 19961217
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> c. Record names, addresses and telephone numbers of all Contractors, <br /> subcontractors and major suppliers of materials and equipment. <br /> 9. Reports: <br /> a. Furnish the ENGINEER periodic reports as required of progress of <br /> the work and of the Contractor's compliance with the progress <br /> schedule and the schedule of Shop Drawing and sample submittals. <br /> b. Consult with the ENGINEER in advance of scheduled major tests, <br /> inspections or start of important phases of the work. <br /> c. Draft proposed change orders and work directive changes, <br /> obtaining backup material from the Contractor and recommend to <br /> the ENGINEER change orders, work `4irective changes and field <br /> orders. <br /> d. Report immediately to the kidINEER and the OWNER upon the <br /> occurrence of any accident. :. <br /> 10. Payment Requests: Review applications for payment with the <br /> Contractor for compliance with the established procedure for their <br /> submission and forward them with recommendations to the ENGINEER, <br /> noting particularly the relationship of the payment requested to the <br /> schedule of values, work completed and materials and equipment <br /> delivered at the site, but not incorporated in the work. <br /> 11. Certificates, Maintenance and Operation Manuals: During the course <br /> of the work, verify that certificates, maintenance and operation <br /> manuals and other data required to be assembled and furnished by the <br /> Contractor are applicable to the items actually installed and in <br /> accordance with the Contract Documents, and have this material <br /> delivered to the ENGINEER for review and forwarding to the OWNER <br /> prior to final payment for the work. <br /> 12. Completion: <br /> a. Before the ENGINEER issues a Certificate of Substantial <br /> Completion, submit to the Contractor a list of observed items <br /> requiring completion or correction. <br /> b. Conduct a final inspection in the company of the ENGINEER, the <br /> OWNER and the Contractor, and prepare a final list of items to be <br /> completed or corrected. <br /> c. Observe that all items on the final list have been completed or <br /> corrected and make recommendations to the ENGINEER concerning <br /> acceptance. <br /> A-! <br />
The URL can be used to link to this page
Your browser does not support the video tag.