Orange County NC Website
2 <br /> Phase I (99 acres, 47 lots)received Preliminary Plan approval on December 19, 1995. <br /> Phase I is generally bounded by NC 10, New Hope Church Road and Stoney Creek. <br /> The applicant is preparing to submit the Final Plat. Grading for roads and installation <br /> of a community water system is underway. <br /> Phase II contains 118 acres and is located south of Rigsbee Road,west of University <br /> Station Road and the Southern Railroad. It encompasses lots 13 and 13C,and a <br /> portion of lot 12 of Tax Map 3, Chapel Hill Township. Sixty-one residential lots are <br /> proposed. Two open space lots,each containing a site for a community well, are <br /> proposed to be owned by the homeowners association. <br /> The zoning district is R-1 Rural Residential and Lower Eno Protected Watershed. The <br /> Land Use Plan designation is Rural Residential. <br /> WASTEWATER DISPOSAL <br /> Individual on-site septic systems are proposed. Environmental Health has indicated <br /> that each of the proposed lots contain soils suitable for septic disposal. <br /> WATER SUPPLY <br /> A community water system is proposed. The Preliminary Plan shows the location of <br /> two well easements. Both of the wells are located within common open space area to <br /> be owned by the homeowners association. <br /> Community wells are regulated by the Public Water Supply Section of the NC <br /> Division of Environmental Health(DEH), which administers the NC "Rules <br /> Governing Public Water Systems". These rules include regulations pertaining to both <br /> surface water and groundwater withdrawals, and apply to all public water systems (e.g <br /> Town of Hillsborough and OWASA), and to all community water systems with 15 or <br /> more connections. <br /> Procedural Requirements <br /> Community wells must be operated by a private operator certified by the North <br /> Carolina Water Treatment Facility Certification Board. <br /> State and local procedural requirements related to community wells are summarized <br /> below. <br /> Prior to Preliminary Plan Approval <br /> • Well sites must be approved by DEH, and a utility plan for the proposed <br /> storage and distribution system must be prepared. Documentation from <br /> DEH indicating approval of the well sites is attached. The Utility Plan was <br /> included as an enclosure in the November 4, 1996 Commissioners agenda <br /> packet. <br />