Browse
Search
Agenda - 11-19-2013 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-19-2013 - Regular Mtg.
>
Agenda - 11-19-2013 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 10:37:50 AM
Creation date
11/15/2013 12:48:56 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 11-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
RES-2013-100 Resolution Endorsing Priority Transportation Projects for TARPO Regional Priority List for 2016-2022 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
RES-2013-101 Resolution Endorsing Priority Transportation Projects for DCHC MPO Regional Priority List for 2016-2022 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br />Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List <br />Project <br />Rank /Map <br />ID # <br />Project <br />Project Description /Need <br />Status <br />(New /Existing <br />Project) <br />Existing Project Score/ <br />Rank <br />Staff Recommendation <br />Orange County as <br />the state. Ranked 21/71 by the <br />$12,600,000, and the estimated right -of -way and utilities cost <br />Need: This project would provide one segment of a bikeway connection through western <br />project priority #11 in <br />MPO for highway projects scored <br />is $1,386,000, which would require a local match of roughly <br />Orange County from Carrboro to the Buckhorn Road and Mebane area and improve the safety <br />2011. <br />in SPOT 2.0. Project is anticipated <br />$3,906,000. Right -of -way and utility costs would not be <br />of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not <br />to rank low among bike /ped <br />covered by the State's share of funding. The submission of <br />likely to score very high using the State's scoring factors and is only eligible for funding at the <br />projects scored. <br />this project requires a resolution or letter of local match <br />division tier. <br />commitment. <br />Project will not be submitted for SPOT 3.0 scoring but will be <br />submitted for consideration of STP -DA and TAP funding to <br />be determined internally by the MPO. <br />Submit to DCHC MPO as project priority #20 as a new <br />bike /pedestrian project. The County must commit to provide <br />Description: Construct bike lanes and sidewalks from US 15/501 to Bennett Road and bike <br />Existing Highway <br />the 20% local match and locally administer the project. The <br />lanes from Bennett Road to the Chatham County line. This project is provided /recommended in <br />Modernization Project <br />Scored in SPOT 2.0 prioritization <br />estimated construction cost of the project according to the <br />the DCHC MPO MTP. <br />submitted for scoring in <br />as a Subregional Highway <br />NCDOT SPOT office is $2,100,000, and the estimated right - <br />Mt. Carmel Church <br />SPOT 2.0. This project <br />Modernization project. Ranked <br />of -way and utilities cost is $231,000, which would require a <br />20 <br />Road Bike /Pedestrian <br />Need: This project would provide a continuous paved bikeway facility from Chapel Hill through <br />was not submitted by <br />20/149 for all Subregional <br />local match of roughly $651,000. Right -of -way and utility <br />Improvements <br />southeastern Orange Count into Chatham County. The project connects to another project <br />g y y p <br />Orange County in 2011 <br />Modernization projects scored in <br />p <br />costs would not be covered b the State's share of funding. <br />y <br />submitted by Chatham County to construct bike lanes along Mt. Carmel Church Road from the <br />ubmi <br />as likely submitted <br />but was <br />w <br />the state. Ranked 12/71 by the <br />The submission of this project requires a resolution or letter <br />Orange County line to Old Farrington Point Road. This segment is listed as a Statewide bicycle <br />previous <br />MPO for highway projects scored <br />of local match commitment. <br />facility in the DCHC MPO MTP and is a continuation of the state's Mountain to Sea bicycle <br />development iterations <br />p <br />in SPOT 2.0. <br />route through Orange County. <br />. <br />Project will not be submitted for SPOT 3.0 scoring but will be <br />submitted for consideration of STP -DA and TAP funding to <br />be determined internally by the MPO. <br />Bike projects that are greater than $1,000,000 in cost can be submitted as highway projects if they involve highway modifications also of benefit to motorized vehicles. Project will likely exceed $1,000,000. The State is maintaining this project in <br />its highway project database. This project will be scored using the highway scoring methodology; however, it is not likely to score well against the State's highway scoring criteria. <br />"Bike /pedestrian and transit projects will be considered new projects for SPOT 3.0 scoring. Previous bike /pedestrian and transit projects submitted for scoring will not automatically be scored for SPOT 3.0. Many transit projects in this priority list <br />are meant to function as a guide for Orange County's assignment of local input points. These transit projects would ultimately need to be submitted by the transit agency responsible for making the respective capital improvements. <br />'Bike /Pedestrian projects require a 20% local match and must be locally administered. Right -of -way acquisition is also not a permissible cost to be funded by NCDOT for these projects. <br />NOTES: <br />1) The 1 -85 and 1 -40 widening projects are already scheduled for reprioritization at the Statewide tier, and staff is suggesting that they be added to the priority list to provide a guide for <br />staff and elected officials to determine to which Orange County projects they should assign local input points in the event that these projects are not funded at the statewide tier and <br />become eligible at the regional or divisional funding tiers. <br />2) One project was removed from the priority list submitted in 2011: Old NC 86 bikeway improvements from Hillsborough Road in Carrboro to 1 -40. All other projects submitted in 2011 <br />are included; however, the staff - suggested order of prioritization for those projects has changed. <br />3) The following projects within the DCHC MPO planning area portion of Orange County are currently in the Statewide Transportation Improvement Program (STIP): <br />a) 1 -40 widening <br />b) 1 -85 widening <br />c) Feasibility study for Dairyland Road paved shoulders project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.