Browse
Search
Agenda - 11-19-2013 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-19-2013 - Regular Mtg.
>
Agenda - 11-19-2013 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 10:37:50 AM
Creation date
11/15/2013 12:48:56 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 11-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
RES-2013-100 Resolution Endorsing Priority Transportation Projects for TARPO Regional Priority List for 2016-2022 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
RES-2013-101 Resolution Endorsing Priority Transportation Projects for DCHC MPO Regional Priority List for 2016-2022 Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br />Attachment 6: Draft Durham - Chapel Hill - Carrboro (DCHC) MPO Project Priority List <br />Project <br />Status <br />Existing Project Score/ <br />Rank /Map <br />Project <br />Project Description /Need <br />(New /Existing <br />Rank <br />Staff Recommendation <br />ID # <br />Project) <br />Description: Implement park- and -ride improvements in the Efland area for cross - county, fixed - <br />route service between Mebane and Durham. <br />Need: The DRAFT Five -Year Orange County Bus Service Expansion Program currently under <br />Submit to DCHC MPO for SPOT 3.0 scoring and <br />development may recommend park- and -ride improvements to be made in the Efland area to <br />consideration of inclusion in the DCHC MPO TIP and STIP <br />connect Efland area residents to proposed cross - county fixed -route service to be implemented <br />as project priority #3 as a new transit project. <br />Park - and -Ride <br />by either Triangle Transit or OPT. The location, extent and cost of improvements have not yet <br />3 <br />Improvements in <br />been determined, however, if the proposed improvements are awarded Federal and State <br />New Transit Project (Not <br />N/A <br />Project will also be submitted for consideration of STP -DA <br />Efland (Conceptual) <br />funding sources, a minimum 10 % percent local match would be required. <br />previously submitted) <br />funding to be determined internally by the MPO; however, a <br />Revenue from the1 /2- percent sales tax and the vehicle registration fee can be expended on <br />20% local match would be required to secure this funding as <br />park- and -ride improvements, however, it has not been determined whether the source of local <br />opposed to a 10% local match if selected for funding via the <br />match funding for this project would be OPT's or Triangle Transit's share of revenue for bus <br />State's scoring and STIP development process. <br />service expansion. This project submission is meant to be a placeholder for the finer details of <br />specific park- and -ride improvement needs to be determined when the recommendations for <br />those needs are finalized. <br />Submit to DCHC MPO for SPOT 3.0 scoring and <br />Description: <br />consideration of inclusion in the DCHC MPO TIP and the <br />STIP as project priority #4 as a new pedestrian /Safe <br />a) Construct sidewalk along west side of Orange High School Road from Harold Latta <br />Routes to School project. If project is not selected as a <br />Road to U.S. 70; <br />successful Safe Routes to School- funded project, the County <br />b) Construct sidewalk along south side of Harold Latta Road from Cloverfield Drive to <br />must commit to provide the required 20% local match and <br />Orange Grove Road; <br />locally administer /manage the project. The estimated <br />c) Install high - visibility crosswalks and in -road signage at school entrances and exits on <br />construction cost of the project according to the Safe Routes <br />Orange High School <br />Orange Grove Road; and <br />New Pedestrian /Safe <br />to School Action Plan is $260,000, which would require a <br />4 <br />Road /Harold Latta <br />d) Construct sidewalk along entrance roads to CW Stanford Middle School. <br />Routes to School <br />N/A <br />local match of roughly $26,000 if the project is not funded as <br />Road Sidewalk <br />Project <br />a Safe Routes to School project. The submission of this <br />Improvements <br />Need: Orange Grove Road serves two schools north of U.S. 70, Orange High School and CW <br />project as a pedestrian project independent of Safe Routes to <br />Stanford Middle School. There are currently no dedicated pedestrian facilities along Orange <br />School funding requires a resolution or letter of local match <br />High School Road to accommodate students accessing the schools from residential areas to <br />commitment. If the project is funded as a Safe Routes to <br />the north and east. The project would provide safe and comfortable pedestrian connections <br />School project, it may be eligible for 100 % funding. <br />from these areas to the schools. The Orange County Safe Routes to School Action Plan <br />Project will also be submitted for consideration of STP -DA <br />identifies these sidewalk and crosswalk improvements as central elements in the plan for both <br />and TAP funding to be determined internally by the MPO; <br />Orange High School and CW Stanford Middle School. <br />however, a 20% local match would still be required to secure <br />this funding. <br />Description: Develop congestion management, limited access, bicycle and pedestrian <br />improvements, and aesthetic and capacity improvements along South Churton Street (Old NC <br />Scored in SPOT 2.0 prioritization <br />86 /SR 1009) from 1 -40 to U.S. 70 Business. More specifically, the project would widen South <br />Existing Highway <br />as a Subregional Highway Mobility <br />Churton Street along this segment to multiple lanes with a landscaped median and would <br />Mobility Project <br />project. Ranked 52/382 for all <br />widen the railroad bridge. This project is recommended in the DCHC MPO Metropolitan <br />submitted for scoring in <br />Subregional Highway Mobility <br />Submit to DCHC MPO for SPOT 3.0 scoring and <br />South Churton Street <br />Transportation Plan (MTP). The feasibility study completed by NCDOT in February 2002 <br />SPOT 2.0. This project <br />projects scored in the state. <br />consideration of inclusion in the DCHC MPO TIP and the <br />5 <br />(Old NC 86) <br />recommends a four (4) -lane divided curb and gutter cross section with a 16 -foot median for the <br />was submitted by <br />Project was ranked 38/71 by the <br />STIP as project priority #5 as a reprioritized highway <br />Improvements <br />entire segment. Orange County will stress the need to study improvements within the current <br />Orange County as <br />MPO for highway projects scored <br />project. <br />right -of -way (ROW) for the segment north of 1 -85 because of the significant built constraints <br />project priority #2 in <br />p p y <br />in SPOT 2.0. The project is <br />along the corridor and its proximity to the Town of Hillsborough's historic district. Orange <br />2011. <br />anticipated to rank about the same <br />County will request that, where conditions do not prevent the addition of frontage roads, the <br />or slightly lower in SPOT 3.0 <br />feasibility study include the addition of frontage roads with limited access from the corridor. <br />prioritization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.