Browse
Search
Agenda - 11-19-2013 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-19-2013 - Regular Mtg.
>
Agenda - 11-19-2013 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2013 12:33:07 PM
Creation date
11/15/2013 12:32:56 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 1 Commissioner Price said she brings these items up this way because of the joint listing <br /> 2 on the agenda. She said she is not contesting the need for a bond, but she wonders about the <br /> 3 timeline. <br /> 4 Chair Jacobs said that is still to be determined, partially by the next item. He suggested <br /> 5 moving forward to the next discussion. <br /> 6 <br /> 7 4. Summary of Ongoing Assessments and Estimates Related to Older Buildings and <br /> 8 Facilities for Both School Districts <br /> 9 <br /> 10 Clarence Grier said there was discussion during the collaboration meeting regarding the <br /> 11 need to address repairs and updates to older schools. He said CHCCS recently had an <br /> 12 assessment and analysis of their older schools. He said the low end figure for limited repair <br /> 13 was quoted at$52 million and goes up to $170 million. He said $43 million of that high figure is <br /> 14 for middle school number 5. <br /> 15 He said that OCS has just started the process and does not have a firm number. He <br /> 16 said the ADM projects a low end figure of$20 million and a high end figure of$68 million. <br /> 17 He said this means the figure for both school systems ranges from $110 million to $230 <br /> 18 million. <br /> 19 He said this figure is well over the general funds budget and it should be noted that the <br /> 20 need to address repairs of old schools is outside of the CIP. He said these needs must be <br /> 21 addressed in future years. <br /> 22 Chair Brownstein asked for clarification on whether the range for both school districts <br /> 23 includes any new schools. <br /> 24 Clarence Grier said middle school #5 was included. <br /> 25 Chair Brownstein said that is not included. She said this only includes analysis of the 10 <br /> 26 older schools for CHCCS. She said this analysis is being done in tandem with Orange County <br /> 27 who has 13 older schools. <br /> 28 Chair Jacobs suggested the superintendents provide an overview of the information from <br /> 29 CHCCS and OCS. He said there is no way with the current budget that these expenses could <br /> 30 be swallowed with one bond issue. He said this would have to be staged with a series of bonds <br /> 31 to cover all of the older school needs. <br /> 32 CHCCS Superintendent Forcella said their next step is to look at the proposal and <br /> 33 options for their older schools in order to prioritize the most important needs. <br /> 34 Chair Brownstein said the sense of urgency is part of the challenge, and the districts are <br /> 35 working together in trying to address some safety issues. She said some are glaring needs that <br /> 36 cannot wait. <br /> 37 Todd LoFrese said phase I of the analysis of their 10 older schools validated that there <br /> 38 are significant needs that include: HVAC systems, air quality issues, safety code issues, <br /> 39 handicap accessibility needs, electrical systems, plumbing systems, and general structural <br /> 40 maintenance issues. He said details are included in the packet. <br /> 41 He said staff is working through possible approaches that may include renovations, or <br /> 42 complete deconstruction for facilities that have exceeded their useful life. He said that some of <br /> 43 this work could push off the need for new schools. He said the need is approaching $200 <br /> 44 million at the older schools, and this does not include middle school number 5. <br /> 45 He said the second phase will be to work directly with building staff to narrow in and <br /> 46 make recommendations on a specific basis at each campus. He said three basic options have <br /> 47 been laid out at each school. <br /> 48 Chair Brownstein said when the numbers for the next ten years were considered, it <br /> 49 became apparent that the band aid approach is not working. <br /> 50 Todd LoFrese said the CIP puts forward $20 million over the next ten years toward all of <br /> 51 the schools, and this is about $100,000 per year for each school. He said this will not go very <br />
The URL can be used to link to this page
Your browser does not support the video tag.