Orange County NC Website
50 <br /> Attachment 4 <br /> • Pre-zoning of land. <br /> • Utility service agreement with Durham. <br /> • Public water & sewer master plan. <br /> • Cross-county bus route planning. <br /> • Striping of 2-ft. bike lanes on Old NC 10. <br /> • I-85/US 70 interchange concept plan. <br /> • Project for 1-85 widening and US 70 interchange in State plans. <br /> Eno EDD- Access Management Plan Study Area (map) <br /> Importance of a formally adopted access management plan: <br /> • Enhancing Interconnectivity and access as properties are developed for non- <br /> residential land uses; <br /> • Developer/property owner compliance in providing transportation infrastructure <br /> consistent with the Plan; <br /> • Enhanced collaboration with the Durham-Chapel Hill-Carrboro Metropolitan <br /> Planning Organization; and <br /> • Procurement of federal and state funding for projects. <br /> • The Plan examines the US 70 and Old NC 10 corridors and recommends access <br /> management criteria and a concept map. <br /> WHAT DOES THE ENO EDD ACCESS MANAGEMENT PLAN DO? <br /> The plan examines the US 70 and Old NC 10 corridors and recommends access <br /> management criteria and a concept map. <br /> WHY EXAMINE THESE CORRIDORS? <br /> • The improvement of the functionality of these corridors to both serve the area's <br /> traffic along these routes is of high local and strategic importance as future <br /> development proceeds in the Eno EDD. <br /> THE PLAN EXAMINES <br /> EXISTING CONDITIONS: <br /> • Zoning and land use <br /> o EDE-1; EDE-2; R-1 ; R-2; MTC <br /> • Environmental Considerations <br /> o Topography; Floodplains; Wetlands <br /> • Future Land Use Plan designations <br /> o Economic Development Activity Node <br /> o 10-Year Transition <br /> o Resource Protection Area <br /> THE PLAN EXAMINES <br /> EXISTING CONDITIONS: <br /> • Existing Transportation Conditions <br /> o Functional classification of roads <br /> o Medians <br /> o Traffic signals <br />