Browse
Search
Agenda - 11-19-2013 - 5c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-19-2013 - Regular Mtg.
>
Agenda - 11-19-2013 - 5c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2015 11:26:47 AM
Creation date
11/15/2013 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5c
Document Relationships
Minutes 11-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
RES-2013-096 Resolution Approving Eno Economic Development District (EDD) Access Management Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> Draft 11-19-2013 <br /> • Intersection spacing and traffic signal spacing; <br /> • Construction of right and left turn lanes; <br /> • The development of strategically placed raised medians; <br /> • The control of median openings; <br /> • Median U-turn treatments or directional crossover to control turning movements <br /> • Strategic connectivity to other roadways; <br /> • The development of auxiliary lanes such as frontage roads; and <br /> • The long-term development of multi-modal options; <br /> Eno EDD -Access Management Concept Map and Criteria <br /> The Eno EDD — Access Management Concept Map has been prepared utilizing land <br /> use, zoning, environmental, transportation data, and evaluating the desired access <br /> management strategies for the area. The map provides a concept for future locations <br /> and public street connections for properties and streets within the Study Area. The <br /> intent of the map is to guide the design of site-access driveways and internal circulation <br /> routes for properties located within the management area that are likely to be developed <br /> at some point in the future. <br /> For those properties that may not be redeveloped by the time the I-85/US-70 <br /> interchange is redesigned, the Plan will also be useful for evaluating how access to <br /> those sites should continue to be served. Given that development proposals may be <br /> years in the future and the details of their layout is unknown, the conceptual access <br /> management map focuses on depicting criteria for development of the future <br /> transportation network within the Study Area. <br /> Accompanying the Eno EDD — Access Management Concept Map is a set of written <br /> access management criteria to guide interpretation and implementation of the map. <br /> The Map follows the policies on page 25. <br /> The Eno EDD Access Management Concept Map has been revised to reflect the <br /> following changes: <br /> • The symbol for the possible commuter rail transit stop has been removed from <br /> the map and legend; and <br /> • The legend for `signalized intersection' has been revised to `existing signalized <br /> intersection'. <br /> 25I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.