Browse
Search
1996 NS ADA -Project Agreement for Orange Co Emergency Watershed Protection
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1996
>
1996 NS ADA -Project Agreement for Orange Co Emergency Watershed Protection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2013 4:36:56 PM
Creation date
11/13/2013 12:26:03 PM
Metadata
Fields
Template:
BOCC
Date
11/4/1996
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9d
Document Relationships
Agenda - 11-04-1996 - 9d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1996\Agenda - 11-04-1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 pages <br /> 4 . Comply with the requirements of the Special Provisions which are <br /> included in Attachment A to this agreement . If applicable, <br /> complete the "Clean Air and Water Certification, " included in <br /> Attachment A. <br /> 5 . Designate an individual to serve as liaison between the Sponsors <br /> and NRCS, listing his or her duties, responsibilities, and <br /> authorities . Furnish such information in writing to NRCS . <br /> 6 . Review and approve the final drawings and specifications for the <br /> works of improvement described in Section A. <br /> 7 . Reimburse NRCS its share of the cost for constructing the works <br /> of improvement as hereinafter provided: <br /> a. Make payments to NRCS upon receipt of Form SCS-FNM-15, Bill . <br /> Billings will be submitted to the Sponsors on a monthly <br /> basis, or as progress payments are made to the <br /> Contractor (s) . <br /> b. Payments must be received within 30 calendar days from <br /> the date of billing. Payments received after the due date <br /> will be considered late payments . For such late payments, <br /> interest will accrue on the unpaid amount at a percentage <br /> rate based on the current value of funds to the U.S . <br /> Treasury for each 30-day period, or portion thereof, that <br /> payment is delayed. <br /> 8 . Upon acceptance of the work by NRCS from the contractor (s) , <br /> assume responsibility for operation and maintenance, as <br /> appropriate, for the works of improvement installed in its area <br /> of jurisdiction. <br /> C. NRCS will : <br /> 1 . Provide 75 percent of the cost of constructing the works of <br /> improvement described in Section A. This cost to NRCS is <br /> estimated to be $108,000. 00 . <br /> 2 . Provide authorized assistance including, but not limited to, <br /> obtaining basic information; preparation of contract drawings, <br /> designs, and specifications; performance of layout; inspection <br /> services; contract administration; and quality assurance during <br /> installation of the works of improvement . <br /> 3 . Contract for construction of the works of improvement described <br /> in Section A. in accordance with Federal contracting procedures . <br /> 4 . Make changes in the work described in Section A. as mutually <br /> agreed upon with the Sponsors, and modify the contract (s) <br /> accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.