Orange County NC Website
Approximate Project Man-Hours <br /> PRINCIPAL SPM PE SCA SET SUR <br /> Analysis Phase 12 50 40 40 20 40 <br /> Construction Phase 96 96 144 1288 144 1440 <br /> Project Commissioning and 8 24 48 40 98 60 <br /> Post Construction <br /> Total 116 170 1232 368 1262 11540 <br /> This project man-hour budget is for reference only. This budget can and will likely vary based on the negotiated scope of <br /> services specific to your project needs.This budget can also vary based on actual construction time and level of on-site services <br /> desired.We would propose a contract that allows the Owner to realize savings on engineering fees should the contractor finish <br /> early.Reimburseables are in addition to the above. <br /> Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 3 <br />