Orange County NC Website
a <br /> 1N ) <br /> z Wesley Wightman, PE <br /> Project Role: Senior Construction Administrator <br /> Project Responsibilities: <br /> • Conduct pre-construction conference <br /> • Review,approve applications for payment <br /> • Review,approve change order requests <br /> • Respond to necessary design changes or field issues <br /> • Be present for startups <br /> • Perform detailed final inspection <br /> • Submit necessary close-out documents to local,state and federal agencies <br /> Wesley Wightman is a valued member of McGill Associates' RELATED PROJECT EXPERIENCE: <br /> professional staff with more than 12 years of experience 6th and 7th Avenue Project-Catawba,North Carolina <br /> directly related to construction and engineering design • 500 LF of 6-inch diameter water main <br /> projects;his engineering background enables him to fully • Approximately 2,360 LF of 8-inch diameter sewer line <br /> understand the many construction inspection and oversight • Replacement of an existing wastewater pumping station <br /> issues related to infrastructure projects in North Carolina. Mr. • Approximately 500 LF of roadway <br /> Wightman began his career with an international construction Initial Budget:$312,000(prepared by another engineering firm) <br /> company and understands all facets of the construction Value of Project:$545,000 <br /> process.He has been a valuable asset with the Firm for four Client:Brian Barnett,Manager (828)241-2215 <br /> years. <br /> Eco Industrial Park Sewer Service-Camden County,North Carolina <br /> Mr.Wightman has extensive experience in managing large • Approximately 29,500 LF of 10-inch diameter sewer line <br /> construction projects,including a keen understanding of • 8-inch sewer force mains <br /> design,contract law and project finance.He is a strong • Submersible wastewater pumping station <br /> communicator,detailed orientated,well organized and Initial Budget:$1.4 Million <br /> thorough.All of this reflects positively for our clients in his Value of Project:$1.4 Million <br /> project meetings,processing of applications for payment, Client:Randell Woodruff,County Manager (252)338-1919 <br /> reviewing shop drawings,and negotiating change orders.He <br /> understands the importance of protecting the Owner's interest Northeast Wastewater Treatment Plant-Hickory,North Carolina <br /> during construction,and ensuring that the approved plans and • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor. <br /> specifications are followed. Initial Budget:Prepared by others <br /> Value of Project:$21,900,004 <br /> EDUCATION: Client:Kevin Greer,PE,City Engineer (828)323-7427 <br /> Bachelor of Science Degree in Civil Engineering <br /> Clemson University,Clemson,South Carolina Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and <br /> Wilkes Counties,North Carolina <br /> PROFESSIONAL REGISTRATION: • Approximately 70,000 LF of pressure sewers <br /> North Carolina Professional Engineer,#033587 • Approximately 13,700 LF of gravity sewers <br /> South Carolina Professional Engineer,#25828 • 9 submersible sewer pump stations <br /> • Approximately 33,400 LF of force mains <br /> PROFESSIONAL ASSOCIATION: Wastewater treatment system and effluent drip irrigation lines for a non- <br /> AWWAMEF discharge disposal system. <br /> Initial Budget:$7,500,000 <br /> Value of Project:$7,310,000 <br /> Client:Patrick Warren,Development Manager (828)295-8667 <br /> Confidential and Proprietary I Central Efland/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 0 1 4 <br />