Browse
Search
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2013 11:17:47 AM
Creation date
11/13/2013 10:16:56 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
7a
Document Relationships
2016-299 Planning - Martin McGill - Amend existing contract and services
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
2017-103 Planning - Martin McGill - Amendment to existing services agreement 2016-299
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 10-15-2013 - 7a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 10-15-2013 - Regular Mtg.
R 2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Andy Lovingood, PE <br /> Project Role: Principal-in-Charge <br /> Project Responsibilities: Contract management <br /> Andy Lovingood is a valued member of McGill Associates' RELATED PROJECT EXPERIENCE: <br /> management staff and has been with the Firm for 20 years. 6th and 7th Avenue Project-Catawba,North Carolina <br /> He has served as principal for many complex water and • 500 LF of 6-inch diameter water main <br /> wastewater projects and he possesses more than 20 years • Approximately 2,360 LF of 8-inch diameter sewer line <br /> of design and management experience.Mr.Lovingood has • Replacement of an existing wastewater pumping station <br /> developed a substantial expertise in project management, • Approximately 500 LF of roadway <br /> treatment plant design,upgrades and expansion,construction Initial Budget:$312,000(prepared by another engineering firm) <br /> administration and project oversight,pump station design, Value of Project:$545,000 <br /> water and sewer system planning and accurate cost estimating. Client:Brian Barnett,Manager (828)241-2215 <br /> He has been formally trained in Construction Management at <br /> N.C.State University and is a licensed General Contractor. Eco Industrial Park Sewer Service-Camden County,North Carolina <br /> Additionally,he has worked as a municipal engineer and • Approximately 29,500 LF of 10-inch diameter sewer line <br /> understands the governmental process. • 8-inch sewer force mains <br /> • Submersible wastewater pumping station <br /> Mr.Lovingood has a broad working knowledge of the state and Initial Budget:$1.4 Million <br /> federal environmental performance standards and regulations, Value of Project:$1.4 Million <br /> including North Carolina Construction Grants and Loans(NC Client:Randell Woodruff,County Manager (252)338-1919 <br /> CG&L).He continues to serve at the request of NC CG&L at a <br /> committee level. Northeast Wastewater Treatment Plant-Hickory,North Carolina <br /> • 4,500 LF of 30-inch interceptor and 6,140 LF of 24-inch interceptor <br /> In addition to his project management expertise,Mr.Lovingood Initial Budget: Prepared by others <br /> previously served in the public sector as a municipal leader, Value of Project:$21,900,000 <br /> having formerly been the City Engineer for the City of Concord. Client:Kevin Greer,PE,City Engineer (828)323-7427 <br /> He is well-versed in the public process and can aid in gaining <br /> public input and public facilitation.He is available whenever Blue Ridge Mountain Club(formerly Ginn Resorts)-Watauga and <br /> the project will call for him to engage and discuss any issues or Wilkes Counties,North Carolina <br /> concerns related to the project. Approximately 70,000 LF of pressure sewers <br /> • Approximately 13,700 LF of gravity sewers <br /> EDUCATION: 9 submersible sewer pump stations <br /> Bachelor of Science Degree in Civil Engineering with • Approximately 33,400 LF of force mains <br /> Construction Management Option • Wastewater treatment system and effluent drip irrigation lines for a non- <br /> North Carolina State University,Raleigh,North Carolina discharge disposal system. <br /> Initial Budget:$7,500,000 <br /> University of North Carolina at Charlotte Value of Project:$7,310,000 <br /> Charlotte,North Carolina Client:Patrick Warren,Development Manager (828)295-8667 <br /> PROFESSIONAL REGISTRATION: <br /> North Carolina Professional Engineer,#023024 <br /> North Carolina General Contractor,#47102 <br /> Confidential and Proprietary I Central Efiand/Northern Buckhorn Sewer Extensions-Construction Phase Services,RFQ No.376-5176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.