Browse
Search
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2013 11:17:47 AM
Creation date
11/13/2013 10:16:56 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
7a
Document Relationships
2016-299 Planning - Martin McGill - Amend existing contract and services
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
2017-103 Planning - Martin McGill - Amendment to existing services agreement 2016-299
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 10-15-2013 - 7a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 10-15-2013 - Regular Mtg.
R 2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section IV: Project Manaaement Approach <br /> • Provide a detailed narrative statement of the firm's perception of the project requirements, <br /> outlining any unique features or conditions that appear to need special attention and that the <br /> firm and proposed project team may be particularly well qualified to address. <br /> • Verify that your firm can begin services as soon as the construction contract for the project has <br /> been signed and approved by the Orange County Board of County Commissioners. <br /> • Include in your proposal the estimated amount of time needed for your firm to Certify the <br /> adequacy of the design prior to the beginning of construction, i.e. the Consultant will indemnify <br /> the County and the original design engineer for the design and take responsibility for the <br /> design of the system going forward <br /> • Include a proposed timeline including estimated Construction Administration hours to <br /> successfully supervise the project as detailed in this RFP. The Owner will be responsible for <br /> all property owner and media liaison responsibilities. <br /> Section V: SUBMISSION OF PROPOSALS <br /> 1. Proposals must be submitted no later than 5:OOPM—local time, Thursday June 30, 2011 to: <br /> David E Cannell, Purchasing Agent <br /> Financial Services <br /> 200 South Cameron Street <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> 2. Proposals shall include statements of interest, ability to complete the work within the required time, <br /> experience, and qualifications. All qualified firms are invited to submit proposals; two (2) copies on <br /> either thumb drives or CD's and two (2) hard copies are required (one clearly marked "ORIGINAL"). <br /> Hard copies must be bound with printing on both sides of sheet on recycled paper with the exception <br /> of tab or divider pages. The electronic file shall be in pdf format and shall be a single file. <br /> 3. Proposals received after the set time for receipt shall not be considered and shall be returned <br /> unopened to the proposer. <br /> 4. Orange County reserves the right to accept or reject any or all proposals, to waive <br /> irregularities, and to reissue any request for proposals. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.