Browse
Search
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2013 11:17:47 AM
Creation date
11/13/2013 10:16:56 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
7a
Document Relationships
2016-299 Planning - Martin McGill - Amend existing contract and services
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
2017-103 Planning - Martin McGill - Amendment to existing services agreement 2016-299
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 10-15-2013 - 7a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 10-15-2013 - Regular Mtg.
R 2013-456 Planning - McGill Associates for Water, Sewer, Design Services, Surveying/Environmental and Water/Sewer Construction $142,000
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Recommend Change Orders and Work Change Directives to Owner, as <br /> appropriate, and prepare Change Orders and Work Change Directives as required. <br /> 7. Review and take action in respect to Shop Drawings and Samples and other data <br /> which Contractor is required to submit, but only for conformance with the <br /> information given in the Contract Documents and compatibility with the design <br /> concept of the completed Project as a functioning whole as indicated by the <br /> Contract Documents. Such reviews and any approvals or other action will not <br /> extend to means, methods, techniques, sequences, or procedures of construction <br /> or to safety precautions and programs incident thereto. Review of Shop Drawings <br /> and Samples identified as frivolous in the General Conditions of the construction <br /> contract documents, or review of substitute materials as defined in the same, shall <br /> be deemed as Additional Services. <br /> 8. Promptly after notice that Contractor considers the entire Work ready for its <br /> intended use, in company with Owner, Mebane, and Contractor, conduct a pre-final <br /> observation visit to determine if the Work is substantially complete. If after <br /> considering any objections of Owner and Mebane, Engineer considers the Work <br /> substantially complete, Engineer shall deliver a certificate of Substantial Completion <br /> to Owner, Mebane, and Contractor. <br /> 9. In company with Owner's and Mebane's representatives, conduct a final <br /> observation visit to determine if the completed Work of Contractor is acceptable so <br /> that Engineer may recommend, in writing, final payment to Contractor. <br /> Accompanying the recommendation for final payment, Engineer shall also provide <br /> a notice that the Work is acceptable to the best of Engineer's knowledge, <br /> information, and belief and based on the extent of the services provided by <br /> Engineer under this Agreement. <br /> 10.Issue instructions to the Contractor from the Owner as to interpretations and <br /> clarifications to the project design plans, specifications and contract documents. <br /> 11.Prepare information required to resolve problems due to actual field conditions <br /> and to respond to Requests for Information (RFI) from the Contractor. <br /> 12.Coordinate and track the testing of pipelines and placing same into service for <br /> the project. Additional visits required due to work not being ready for testing, <br /> retesting, or Contractor scheduling conflicts shall be considered Additional <br /> Services. <br /> 13.Assist the Owner in the selection and coordination of an independent <br /> geotechnical and materials testing laboratory to be provided at the Owner's <br /> expense as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.