Browse
Search
Agenda - 11-04-1996 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 11-04-1996
>
Agenda - 11-04-1996 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2013 8:37:49 AM
Creation date
11/12/2013 8:37:46 AM
Metadata
Fields
Template:
BOCC
Date
11/4/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 19961104
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 6 <br /> (3) whether factors other than market conditions and beyond the control of the subdivider <br /> caused a delay in meeting the phasing plan; and <br /> (Prior to beginning Section Two, the developer must install a left turn lane and a right <br /> turn taper on Davis Road The applicant indicates that he has encountered difficulty <br /> locating "competent paving contractors who are willing to offer competitive bids for <br /> construction of the improvements.") <br /> (4) whether the development project,if completed consistent with the Preliminary Plat,will <br /> tend to aid or meet an important public policy goal established by the Board of County <br /> Commissioners; and <br /> (Public policy goals affecting New Hope Springs Subdivision have not changed since <br /> 1994. The Preliminary Plat remains consistent with the Comprehensive Plan and the <br /> implementing ordinances that were in place at the time ofpreliminary approval.) <br /> (5) whether the application for an amended phasing plan was submitted before the previously <br /> approved time limit(s)has lapsed; and <br /> (The request for approval of an amended phasing plan was received prior to the <br /> expiration of the administrative re-approval of the Section Two Preliminary Plana <br /> (6) the possibility of and practicality of the subdivider and developer completing the <br /> development project consistent with Orange County regulations applicable if the phasing <br /> plan amendment is not granted;and <br /> (If the amended phasing plan is not approved, and if the developer chooses to proceed <br /> with Section Two, a new application would be subject to the procedures for Concept <br /> Plans adopted earlier this year with the flexible development standards. Section Two of <br /> New Hope Springs is located between Section One, which is almost built out, and Section <br /> Three which is in the Rural Buffer where flexible development does not apply. No open <br /> space was reserved in Section One or proposed in Sections Two and Three. <br /> If a new application were to be submitted for Section Two, the developer probably would <br /> not choose an open space option since he has already invested in the previously approved <br /> conventional plan.) <br /> (7) whether the time by which improvements must be completed or installed would not be <br /> extended by the revised phasing plan. <br /> (The improvements required for Section Two would remain the same, although the time <br /> period for installation would be extended according to the amended phasing plan) <br />
The URL can be used to link to this page
Your browser does not support the video tag.