Orange County NC Website
6• <br /> •� le, <br /> BUILDING COST ANALYSIS <br /> October 7, 1996 <br /> Page 1 <br /> 118'/2 East Maln Street Project: Community School for People Under Six <br /> Carrboro,NC 27510 400 Caldwell Street <br /> Chapel Hill, NC 27514 <br /> Architect's Project No: 9601 <br /> Summary of Building Cost(not including sitework) <br /> Current Building Design <br /> Resolute Building Co. $246,387 <br /> Pricing based on plans dated 6-20-96 <br /> Alexandra Building Co. $215,000 <br /> Pricing based on pions dated 8-15-96 <br /> Revised Building Design <br /> Alexandra Building Co. (estimate) $ 180,490 <br /> Changes associated with revised building desig: <br /> Reduce "Square Footage per Child' from 40 SF to 35 SF. <br /> (This change deletes approx. 160 SF from building.) <br /> Delete raised roof over Lobby and Playroom. <br /> (This change deletes approx. 110 SF from Playroom.) <br /> Simplify Entrance Gable. <br /> Incorporate Value Engineering Items of August 26, 1996. <br /> (Note: Item 7 will remain) <br /> Building Estimate based on the following: <br /> New revised building size of 2053 SF x S80/SF= $164,240 <br /> Renovated building area of 650 SF x$25/SF = $ 16,250 <br /> Total Cost(not including sitework) $ 180,490 <br /> Construction Start- Beginning of January 1997 <br /> telephone 919.967-0158 <br /> fax/data 919967-0159 <br />