Browse
Search
Agenda - 10-15-1996 - 8j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 10-15-1996
>
Agenda - 10-15-1996 - 8j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2013 9:47:55 AM
Creation date
11/11/2013 9:47:53 AM
Metadata
Fields
Template:
BOCC
Date
10/15/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8j
Document Relationships
Minutes - 19961015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Co-facilitator, 9 days @$280 6 <br /> Small group facilitators, as needed Pro bono. <br /> Photocopy/Distrubution. <br /> No direct cast(jurisdictions provide) <br /> Desiga,Assembly of Governments meeting 10680 <br /> Review minutes of community and Task Force meetings and other interim documents. <br /> Meet with Steering Committee. Consult with officials, as needed Develop Meeting Pkuc <br /> Sachs, 3 days @$560 <br /> Photocopy/Distribution. <br /> No direct cost fictions provide) <br /> Facilitation of Assembly of Governments meeting 5560 <br /> Sachs and co-facilitator, 112 day each @$560 each per dory <br /> SOX <br /> As noted in the RFP,the potential exists for additional facilitated meetings over the course <br /> of this project. For example, there might be a need for one or more facilitated community <br /> meetings at which members of the Task Force would receive citizen input. Although not <br /> envisioned in the RFP,we think it possible that the Task Force will want to use facilitators <br /> at one or more of its sessions during Steps 3,4 or 5. It would be prudent to plan for such <br /> Willngencies. <br /> As a local resource, DSC can be available for consuhntions and facilitation to this process <br /> on an as-needed basis. To provide for predictable cost motes over the course of this <br /> 30-month project,we propose to charge$70.00 per hour per person for up to two co- <br /> facilitators and $20 per hour for any small group moors needed as a contingency <br /> under this project Planning,preparation and follow-up time would be included in all <br /> calculations of costs to the project in addition to time spent by&cilitators in meetings. In <br /> addition,DSC would be compensated by the sponsoring jurisdictions for any necessary <br /> out of pocket vcpenses. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.