Orange County NC Website
M <br />Table 5 <br />Limited Physical Assessment - 10 Year Capital Cost Estimates <br />Location <br />Repair /replacement project <br />Cost <br />Central Orange Senior Center <br />TPO roof replacement <br />$35,000 <br />HVAC Equipment <br />$280,250 <br />Total <br />$315,250 <br />Asset Mgmt North <br />HVAC Equipment <br />$35,400 <br />Building envelope <br />$20,000 <br />Total <br />$55,400 <br />Animal Services Center <br />Parking lot repair <br />$187,350 <br />Total <br />$187,350 <br />501 West Franklin <br />Parking lot repair <br />$14,400 <br />Public Defender <br />Replace modified bitumen roof <br />$26,500 <br />Replace shingle roof <br />$7,200 <br />Replace HVAC equipment <br />$109,268 <br />Piedmont Food & Ag Center <br />Building Envelope <br />$37,700 <br />Total <br />$195,068 <br />West Campus Building <br />Basement leak allowance <br />$10,000 <br />Replace TPO roof <br />$26,000 <br />Replace HVAC equipment <br />$703,811 <br />Total <br />$739,811 <br />Southern Human Services <br />Parking lot repair <br />$944,100 <br />Motor Pool <br />Cracked block in break room <br />$3,000 <br />Replace HVAC equipment <br />$429,638 <br />Building Envelope <br />$85,000 <br />Total <br />$1,461,738 <br />Solid Waste Admin <br />Parking lot repair <br />$193,500 <br />Total <br />$193,500 <br />Skills Development Center <br />Parking lot repair <br />$103,950 <br />Replace modified bitumen roof <br />$15,000 <br />Replace EPDM roof <br />$22,000 <br />Replace shingle roof <br />$6,750 <br />Replace HVAC equipment <br />$195,172 <br />Building Envelope <br />$130,000 <br />Total <br />$472,872 <br />Seymour Senior Center <br />Parking lot repair <br />$357,675 <br />Replace HVAC equipment <br />$395,005 <br />Total <br />$752,680 <br />Public Defender <br />Cracked block (fagade) repair <br />$4,500 <br />Replace HVAC equipment <br />$104,135 <br />Total <br />$108,635 <br />Piedmont Food & Ag Center <br />Parking lot repair <br />$7,500 <br />Total <br />$7,500 <br />Orange County Jail <br />Parking lot repair <br />$127,575 <br />Replace EPDM roof <br />$24,000 <br />Replace modified bitumen roof <br />$25,000 <br />Building Envelope <br />$190,000 <br />Total <br />$366,575 <br />Motor Pool <br />Parking lot repair <br />$1,363,050 <br />Replace metal roof (Old) <br />$99,000 <br />Replace shingle roof (New) <br />$51,750 <br />Building Envelope (New) <br />$80,000 <br />Building Envelope (Old) <br />$50,000 <br />Replace HVAC equipment <br />$159,300 <br />Total <br />$1,803,100 <br />-15- <br />