Orange County NC Website
Informal Resident Advisory Work Group 9 <br />Cedar Grove Community Center <br />July 16, 2013 <br />Page 2of4 <br />• John Thomas Reviewed some of the project constraints <br />o Site plan was reviewed. <br />o The 10,000 sf renovation that has been funded. That area does not include the existing bathrooms. <br />o Mothballing of the wings would require installation of minimal HVAC to maintain conditionig, upgrade <br />of the fire alarm to meet code and fire rated isolation of the classroom wings. <br />o To meet the direction from the Commissioners, two alternate approaches will need to be developed, the <br />mothball plan based on reusing existmg bathrooms and a no mothball plan developing new replacement <br />bathrooms. <br />o The existing septic tank has a 2,400 gallon a day capacity, the building if fully utilized requires 3,500 <br />gallon a day capacity. The bathroom building constructed with the park has been allocated 1,000 gallons a <br />day for its septic system. Therefore there is 1,400 gallons of capacity available for the renovated facility. <br />• There was discussion regarding whether the 1,000 gallon a day figure included die planned <br />bathrooms in Phase 2 of the park. The Michael and Lori stated that they would research this and <br />report back. <br />• Phase 2 of the park is not planned to be constructed for at least 5 years. <br />• The architect requested a copy of the phase II plan for the park. <br />o Jeff Thompson indicated the county environmental health department had done a preliminary review of <br />the septic system and believed that 1,400 gallon a day was enough capacity for a "reasonable" 10,000 <br />square foot community center. <br />■ That assessment assumed the facility would not have a commercial kitchen, but could have an <br />"instructional" or "church kitchen ". <br />• Currently the existing building is only occupied by Parks and Recreation. The have one park employee is <br />using an office space. This space will be required in the renovated facility. <br />■ It was stated that there would also need to be an office for a recreation department employee <br />who would be running the facility. <br />• Who will be running the facility is undetermined at this time. <br />• The existing playgrounds adjacent to the classroom wing have to remain or be replaced as these were <br />erected using grant money. <br />• Michael stated that the site is within a "critical' watershed and that this meant that there could only be <br />6% impervious surface. Gravel parking lots are counted as "impervious" surface. Site area is 40 plus <br />acres as it includes the entire park. <br />■ As site across road is not "contiguous" and could not be used to off set impervious surface, but <br />could be the site for a proposed "park and ride" lot. <br />• John Thomas led a discussion of the programs and spaces envisioned for the facility. <br />o Meeting spaces are needed. A variety of different size spaces are needed for different groups to use <br />within the facility. Some of these group could be <br />• Family reunions up to 100 people <br />• Meetings ± 12 people <br />• Scouts <br />• 4H <br />• It was stated that at the Hillsborough public library that there was a 600 sf meeting room that has the <br />ability to be shut off from the rest of the facility and has an exterior entrance with access to toilets. <br />• Lori Taft agreed to review the former bookings at the facility to see who and what size groups have <br />rented the space in the past. <br />• Large groups (100 ± people) would probably only occur 5 -6 times a year. <br />• County Government would potentially use meeting spaces 15 -20 times per year. <br />