Orange County NC Website
roposed Solution <br />Preliminary Cost Estimate <br />General Conditions <br />Selective Abatement & Deconstruction <br />Building Renovation <br />$172,712 <br />$294,881 <br />$1,029,247 <br />Site Work $253255 <br />Construction Subtotal $195779383 <br />Contingency <br />Professional Fees <br />Cultural & Archeology Study <br />Construction Testing & Inspections <br />Permits & Fees <br />Audio Visual Equipment <br />Signage <br />$105930 <br />$173500 <br />$5,000 <br />$15774 <br />$2,000 <br />$20,000 <br />$3500 <br />FF &E $94643 <br />Project Total $19997730 <br />41 <br />_o <br />b <br />xatttl ti:acD`t» <br />