Browse
Search
Agenda - 11-12-2013 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-12-2013 - Work Session
>
Agenda - 11-12-2013 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2015 3:11:27 PM
Creation date
11/8/2013 2:15:22 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 11-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Informal Resident Advisory Work Group <br />Cedar Grove Community Center <br />September 24, 2013 <br />Page 4of5 <br />54 <br />o It was stated as part of reroofing the project that the gutters and downspouts would be replaced and that <br />the new downspouts would be tied into a new underground system to allow for them to be piped off <br />from the building and not cause issue with the septic drain field. <br />• John Thomas then led the Informal Advisory Group on a tour of the facility to review the spaces and their future <br />uses. <br />• The Informal Advisory Group stated that they wanted the building to maintain as much of the original <br />look as possible. <br />• The floor finishes where discussed. <br />■ The Multi- purpose room will be provided with a cushioned rubber floor system that will support <br />multiple functions. This same floor finish will also be provided to the stage /exercise room. <br />• In the Multi- purpose Room it was stated that the Informal Advisory Group and the County would prefer <br />to have overhead retractable basketball goals and backboards. <br />• The Informal Advisory Group stated that they would prefer to see the 2 pair of existing doubles to the <br />corridor remain at the Multi- purpose Room so these could be used for in /out doors during events but <br />that it was acceptable that these be provided with doors. <br />• The county requested that in floor sleeves be provided in the Multi- purpose Room for volleyball and <br />badminton net posts. <br />• It was stated by the architect that there would be a light bar with LED spot lights provided at the stage <br />but this would be a small system only and not designed for theatre productions. <br />• A small system would be provided at the Multi- purpose room as well as a cabinet with connections for <br />microphones and an auxiliary player like an I -pod. <br />• It was discussed that acoustical treatments would need to be provided to the Multi- purpose to allow the <br />space to be used for multiple events. This treatment could be provided by banners in the roof structures <br />and wall panels. <br />• The Informal Advisory Group asked if the existing lights would be retained in the Multi- purpose room it <br />was stated that they would not but that either compact fluorescent lights or LED lights would be <br />provided and they would have a similar look to them. <br />• The Informal Advisory Group and the county both suggested that the door between the Facility Office <br />and the Multi -media Room be retained so that the person in the Facility Office has easy access to the <br />Multi -media room to "trouble- shoot" any computer issues. <br />• It was stated that Luxury Vinyl Tile (LUT) flooring products as discussed previously would be provided <br />throughout the rest of the project but that either carpet or loose rugs could be provided at the Internet <br />Cafe to provide it with a more "soft living room" feel. <br />• The heating and cooling of the building was discussed and John Thomas stated that at the moment the <br />engineer was investigating options but was looking at provided the air handlers in one of the classrooms <br />within the "mothballed" area and then ducting thru the existing exposed roof structure to the different <br />spaces. The county stated that had had issues with "noise" from exposed ductwork, the architect stated <br />that they would look at using dual wall ductwork to request this. The county stated that they had had <br />good success with the use of Mitsubishi ductless mini split systems on other projects. <br />• The Informal Advisory Group asked if the architect had investigated geothermal HVAC for the project. <br />The architect stated that they had had preliminary discussion on the use of geothermal with the engineer <br />and that they had done preliminary calculations which showed that the project would require <br />approximately 120 — 200 feet deep wells. <br />• The Informal Advisory Group also asked if the county had considered solar energy for hot water heating, <br />the county stated that the payback period on this would be approximately 25 years. The county stated <br />that they had no issues with the use of tankless water heaters. <br />
The URL can be used to link to this page
Your browser does not support the video tag.