Browse
Search
Agenda - 11-12-2013 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-12-2013 - Work Session
>
Agenda - 11-12-2013 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2015 3:11:27 PM
Creation date
11/8/2013 2:15:22 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 11-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Informal Resident Advisory Work Group <br />Cedar Grove Community Center <br />August 27, 2013 <br />Page 5of7 <br />36 <br />■ Members of the Informal Resident Advisory Work Group asked about the level of charges for <br />use of the proposed spaces. There are full size gym spaces available to rent from the school <br />system, but the level of charges are cost prohibitive. It was stated that the use charges need to <br />reflect a rate that members of the community could afford. <br />o Option (which was originallpresented at the last meeting was reviewed again as a potential option <br />just for the G <br />■ An expanded Gymnasium is provided and the roof is raised to provide 20' -0" clearance over the <br />court. <br />• The basketball court would be full width (50� but not full length (68' -0'�; a regulation <br />high school court is 84' -0" long. <br />• It was stated that no bleacher seating was being provided in the new gym, but the width <br />could be increase to accommodate bleachers. <br />• It was stated that the architect had reviewed raising the roof with a structural engineer <br />and based on the information that they had provided it would be less expensive to <br />remove the existing roof and provide a new roof with new supporting structure. <br />• This new gymnasium could still be provided with access to the existing stage. <br />• The cost of expanding the gymnasium and raising the roof will be $180,000 - $200,000 <br />• The existing south wing with the smaller classrooms would remain but be mothballed. <br />• The existing north classroom wing will be removed to allow the gymnasium expansion to be <br />built. <br />• There was some discussion on the possibility of doing the enlarged gym and leaving the existing <br />wing in place and it was stated that this could not be achieved within the budget. <br />o Option "Al" (which is a revised version of Option "A" presented at the last meeting <br />• The existing Gymatorium remains in place and the roof is not raised. <br />• A folding partition is added to the front of the stage to allow this space to be used both as a <br />Stage and a Classroom. <br />• Handicapped access to the stage would be provided by a wheelchair lift. <br />• A separate office for a facility manager has been added <br />• The existing wings remain but are mothballed. <br />• New group toilets are provided in the same location as the existing toilets but are enlarged, made <br />handicapped accessible and provided with exterior access. <br />• The existing library becomes a recreation room. <br />• Internet Cafe is provided adjacent to ceremonial front door by removing a portion of the <br />existing masonry walls to create a large open space. <br />■ Wireless internet is to be provided thru -out the entire building. <br />• A Conference Room is provided adjacent to Internet Cafe <br />• The existing breezeway between the existing main building and the Dining Room would be <br />enclosed and made into a Lobby /Corridor <br />• A new Kitchen is created in the west half of the existing kitchen area. <br />• The Kitchen is provided with direct access to the Large Group Meeting Room with a <br />pass thru window with counter top and roll up door. <br />• The existing dining space is subdivided into three spaces, a Large Group Meeting Room, Small <br />Group Meeting Room and Classroom. <br />There are operable walls provided between all of the Large Group meeting Room and <br />each of the adjacent spaces so that can be opened up into one large space. This space <br />would a large "U" shaped space <br />
The URL can be used to link to this page
Your browser does not support the video tag.