Orange County NC Website
Informal Resident Advisory Work Group <br />Cedar Grove Community Center <br />August 13, 2013 <br />Page 6of7 <br />25 <br />Parks and Recreation office is located at the back of the existing Kitchen to provide <br />visual connection and easier access to the existing park. <br />o Option "D" <br />■ A new Gymnasium is provided and the roof is raised to provide 20' -0" clearance over the court. <br />The basketball court would be full width (50� but not full length (68' -0'�; a regulation <br />high school court is 84' -0" long. <br />• No showers or locker rooms are provided 'many option. <br />• A folding partition is added to the front of the stage to allow this space to be used both as a <br />Stage and as an Exercise Room. <br />• Handicapped access is provided to the stage by a new ramp located in the existing storage area <br />north of the Stage. <br />• The existing breezeway between the existing main building and the dining room would be <br />enclosed and made into a Lobby /corridor <br />• Both the existing wings are deconstructed. <br />• New toilets are provided and these could have exterior access provided if required. <br />• Internet Cafe is provided adjacent to "ceremonial" front entry by removing a portion of the <br />existing masonry walls to create a large open space. <br />• Parks and Recreation office is provided adjacent to Internet Cafe <br />• The group expressed concerns that the Parks and Recreation office was too large and <br />that too much storage was shown for Parks and Recreation. <br />• It was determined that some of this storage would be general storage. <br />• Jeff Thompson stated that at some of the other community facilities within the county <br />have nearly 10% of the building used for storage. <br />■ The existing dining and kitchen areas are redeveloped to provide a new Kitchen, Conference <br />Room, Large Group Meeting Room, Small Group Meeting Room and Rec Room. <br />• The Large Group Meeting Room is able to expand into the Small Group Meeting Room <br />for larger events by opening a movable wall between the two spaces. <br />• Large Group Meeting Room can hold 68 people and when the movable wall is opened <br />to include the Small Group Meeting Room it can hold up to 102 people seated at tables <br />and chairs. <br />o The group stated this was not large enough. <br />• Kitchen is provided with direct access to the corridor adjacent to the Large Group <br />room. A pass thru window with counter top and roll up door is provided to the corridor <br />to facilitate serving. <br />■ The group expressed major concerns about the wings being removed in this scheme. <br />• Jeff Thompson reviewed the budget which is $2,000,000 (based on $200 per square feet). The budget includes <br />design fees as well as construction costs. This budget does not include any costs associated with the operation of <br />the building after construction was complete. <br />• An additional $250,000 has been budgeted for hazardous material abatement and deconstruction of the wings. <br />• If the wings are mothballed then this funding could be used for the work to mothball the wings. <br />• The county has a 2 -year old estimate of $161,000 for the abatement of asbestos, lead paint and other <br />materials throughout the building and the deconstruction of the wings. <br />• John Thomas then asked the group to review the elements they liked from the concepts presented and which <br />items need further development. <br />o There was not a consensus about expanding the Gymnasium. <br />