Orange County NC Website
Informal Resident Advisory Work Group <br />Cedar Grove Community Center <br />August 13, 2013 <br />Page 5of7 <br />24 <br />o A folding partition could be provided between the Large Group Meeting Room <br />and the Internet Cafe space and the space could then accomodate up to 150 <br />people. <br />■ The existing kitchen area is subdivided into space for Parks and Recreation and building support <br />spaces. <br />• The Parks and Recreation office and storage areas are provided at the back of the <br />existing Kitchen so they had easier access to the existing park. <br />• The group expressed concerns the Parks and Recreation offices and storage areas were <br />too large. <br />o Option "C" <br />■ An expanded Gymnasium is provided and the roof is raised to provide 20' -0" clearance over the <br />court. <br />• The basketball court would be full width (50� but not full length (68' -0'�; a regulation <br />high school court is 84' -0" long. <br />• It was stated that no bleacher seating was being provided in the new gym, but the width <br />could be increase to accommodate bleachers. <br />• It was stated that the architect had reviewed raising the roof with a structural engineer <br />and based on the information that they had provided it would be less expensive to <br />remove the existing roof and provide a new roof with new supporting structure. <br />• This new gymnasium could still be provided with access to the existing stage. <br />• The cost of expanding the gymnasium and raising the roof will be $180,000 - $200,000 <br />• A folding partition is added to the front of the stage to allow this space to be used both as a <br />Stage and as a Classroom space. <br />• Handicapped access is provided to the stage by a new wheelchair lift located in the existing <br />storage area north of the Stage. This approach allows additional storage to be provided in the <br />adjacent area as the lift does not require as much floor space as the ramp. <br />• The existing south wing with the smaller classrooms would remain but be mothballed. <br />• The existing north classroom wing will be deconstructed to allow the gymnasium expansion to <br />be built. <br />• New group toilets are provided in the same location as the existing toilets but are enlarged, made <br />handicapped accessible and provided with exterior access. <br />• The existing breezeway between the existing main building and the dining room would be <br />enclosed and made into a Lobby /corridor <br />• Existing library was rehabilitated in this scheme due to the anticipated cost of enlarging the <br />gymnasium and raising the roof. <br />• The existing space adjacent to ceremonial front door is redeveloped as a Recreation Room <br />• The existing dining and kitchen areas are redeveloped to provide a new Kitchen, Conference <br />Room, Large Group Meeting Room, Small Group Meeting Room, Internet Cafe and Parks <br />Office. <br />• The Kitchen is provided with direct access to the Large Group Meeting Room using a <br />pass thru window with counter top and roll up door. <br />• The Large Group Meeting Room is able to be expanded into the Small Group Meeting <br />Room for larger events by opening a movable wall between the two spaces. <br />• The Large Group Meeting Room can hold 93 people and when the movable wall is <br />opened up to include the Small Group Meeting Room it can hold up to 125 people <br />seated at tables and chairs. <br />