Orange County NC Website
2 <br />More in depth background and history related to the Northern Human Services Center <br />Community Center can be found within the June 18, 2013 Agenda Abstract as Item 7 -e, located <br />at http:// orangecountync .gov /occierks /130618.pdf. <br />Through the summer and early fall, staff from Asset Management Services, the Department of <br />Environment, Agriculture, Parks and Recreation, and the County Manager's Office worked with <br />the consultant and the Resident Advisory Work Group in a diligent, thoughtful and productive <br />manner to achieve consensus on a schematic design for the Board's review, comment, and <br />potential authorization to move forward with construction document preparation and <br />construction bidding in the spring of 2014. Attachment B includes the meeting minutes of these <br />work group meetings. <br />John Thomas of MBAJ Architects will present the schematic design consensus to the Board for <br />feedback and guidance, as well as the cost benefit analysis of the classroom wing mothball <br />option. General schematic site and space plans are described in Attachment C, "Schematic <br />Design Presentation, MBAJ Architects ". <br />The project cost estimate prepared by MBAJ Architects is described in Attachment D, "Project <br />Cost Estimate ". Attachment E, entitled "Classroom Wing Mothball Option Cost Estimate ", <br />illustrates the design and construction costs for the mothball option. As a reminder, should the <br />mothball option be selected by the Board, deconstruction costs in the amount of $250,000 <br />budgeted within the Capital Investment Plan would potentially inure to the benefit of the project <br />and the potential execution of the mothball option. This point is highlighted in the mothball <br />option cost estimate. <br />FINANCIAL IMPACT: The Board approved the FY2012 -17 Capital Investment Plan ( "CIP ") <br />that included $250,000 in FY 2012 -13 for deconstruction of sections of the facility in preparation <br />for the future use on the site. The Board also approved $2.0 million in FY2014 -15 for the <br />design and construction of the new facility that, when combined with the $250,000 authorized in <br />FY 2012 -13, brings the total project capital budget to $2,250,000. <br />The Board - authorized MBAJ Architects' current engagement will not exceed $173,500 and <br />includes the incremental cost of $6,500 for the mothball option cost - benefit analysis the Board <br />approved during the regular meeting on June 18, 2013. Should the Board consider the <br />mothball option design cost of $28,800, the amended amount would increase to a not -to- <br />exceed amount of $202,300. The current CIP project could cover this cost. <br />The estimated project cost for the Cedar Grove Community Center does not exceed $2,000,000 <br />as described in detail within Attachment C, "Project Cost Estimate ". The estimated additional <br />cost for the mothball option design and construction approaches $608,800, and is described in <br />Attachment D, "Classroom Wing "Mothball" Option Cost Estimate ". Crediting the approved <br />$250,000 budgeted for deconstruction of the wings reduces the $608,800 mothball option <br />estimate to $358,800. <br />Since the Board may be presented with the mothball option alternate as part of the bid award <br />consideration during the spring of 2014, a potential decision on moving forward with this option <br />could be made during the normal annual Capital Investment Planning process and schedule. <br />Should the Board choose not to invest in the mothball option construction alternate, the design <br />remains valuable and can be constructed at some point in the future. The estimated cost, <br />should the construction not occur as part of the main community center project, will be <br />