Browse
Search
Minutes 09-09-2013
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2013
>
Minutes 09-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2013 12:24:18 PM
Creation date
11/6/2013 12:20:32 PM
Metadata
Fields
Template:
BOCC
Date
9/9/2013
Meeting Type
Public Hearing
Document Type
Minutes
Document Relationships
Agenda - 09-09-2013 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - C1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - C2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - C3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - C4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - C5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
Agenda - 09-09-2013 - E1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-09-2013 - Quarterly Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Future Land Use Element Map Designation — Commercial Industrial Transition Activity <br /> Node <br /> • Growth Management System Designation -- Urban. <br /> • Existing Conditions -- The property is developed and utilized to support a metal sheet <br /> fabrication operation. <br /> • Access -- The property has direct access onto Southern Drive. <br /> REQUEST: <br /> • Property is split zoned residential and industrial. <br /> • Necessary infrastructure (i.e. septic, parking) on residentially zoned portion of property. <br /> • Applicant concerned over long-term ability to continue operation with necessary <br /> components on `residentially' zoned property. <br /> • Applicant requests entire property be zoned 1-1 (Light Industrial) so `use' would be <br /> considered conforming. <br /> FUTURE LAND USE MAP: <br /> COMMERCIAL/INDUSTRIAL TRANSITION: <br /> • Per approved Comprehensive Plan area `appropriate for retail and other commercial <br /> uses and/or manufacturing and other industrial uses'. <br /> • County did not eliminate all residential zoning in the area when land use category <br /> created/adopted so individuals could still make use of property. <br /> • Area is intended to support non-residential development including industrial (i.e. <br /> manufacturing). <br /> STAFF ASSESSMENT: <br /> • The application is complete. <br /> • The property is of sufficient size. <br /> • Rezoning consistent with the Orange County 2030 Comprehensive Plan, Growth <br /> Management System Map, and adopted Efland Mebane Small Area Plan, <br /> • Represents logical extension of existing 1-1 district. <br /> • Applicant's issue is not unique. <br /> • Staff has previously identified similar problems on other properties throughout the <br /> County. <br /> • Staff will be bringing a comprehensive solution for consideration by the BOCC in the fall. <br /> • Staff did not want applicant to wait for staff's review to be complete and encouraged the <br /> submittal of rezoning request. <br /> RECOMMENDATION: <br /> 1. Refer the matter to the Planning Board with a request that a recommendation be <br /> returned to the Board of County Commissioners in time for the November 5, 2013 <br /> BOCC regular meeting. <br /> 2. Adjourn the public hearing until November 5, 2013 in order to receive and accept the <br /> Planning Board's recommendation and any submitted written comments. <br /> Michael Harvey said this is not an uncommon issue, and it is due to past zoning <br /> practices that restricted commercial zoning to a small square around industrial buildings, while <br /> leaving all other areas as residential space. He said staff will be bringing forward more parcels <br /> in the future as attempts are made to fix the zoning issues on those lots as well. <br /> Commissioner Dorosin asked for clarification on the commercial/industrial transition slide <br /> and the fact that residential zoning is not eliminated. <br /> Michael Harvey said there is residential zoning in the area. He said the purpose of the <br /> activity node is to encourage and create more retail and manufacturing opportunities by the <br /> extension of the land use category; however residential land use was not eliminated as part of <br /> this. <br /> He noted that Ronald Keizer and any other non-residential land owner in the area will be <br /> held to the existing land use buffer standards, as listed in article 6. <br /> Commissioner Dorosin said he is not sure he understands the map and zoning <br /> designations on the future land use map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.