Orange County NC Website
Attachment C <br /> DENR Contract 4119 <br /> Bulleted list showing project milestones and detailed implementation plan dates for Project A: <br /> • July 2011: Prepare and issue bid for roll-off containers. <br /> • August 2011: Award bid for containers and prepare area at landfill to receive <br /> shingles.Finalize arrangement with paving companies or others to <br /> accept shingles. <br /> • September 2011: Begin education, outreach and marketing with select roofers for pilot <br /> project. <br /> • October 2011: Receive roll off containers,begin accepting shingles from pilot project <br /> roofers. <br /> • November 2011: Continue pilot and conduct demonstration and/or training as necessary <br /> for area roofers to enable delivery of clean materials. <br /> • December 2011: Mass marketing program for all area roofers. <br /> • January 2012: Begin accepting tear off shingles from any roofer or repair company. <br /> • February 2012: Evaluate project and fine-tune. <br /> • March 2012: Continue project and present results at SWANA and/or CRA if <br /> appropriate. <br /> • June 30: 2012: Prepare and submit final report to state. <br /> Grant Budget for Project A <br /> State Grant Orange Co. Cash <br /> Item Award Match Project Total <br /> Three each 20 cubic yard <br /> Roll-Off containers for roofing <br /> shingles $ 11,968 $ 2,632 $14,600 <br /> Total $ 11,968 1 $2,632 $14,600 <br /> Project B• This project is to expand and improve efficiency in recyclable baling operation <br /> Detailed Description of Project Orange County currently bales mixed paper and rigid [non- <br /> bottle] plastics, separately, at the recycling operations area at the Orange County landfill. To do <br /> this we use an Orange County-owned vertical baler and a leased horizontal baler. Neither of <br /> these machines is ideal for the materials we are handling. Considerable manual labor is required <br /> when baling,and the resultant bales, particularly the rigid plastics bales, are light and this limits <br /> the county's ability to market this material. <br /> To improve operational efficiency and safety, and to increase the options for marketing rigid <br /> plastics, Orange County proposes to purchase a horizontal baler and in-feed conveyor. This <br /> machine will be installed in the location currently occupied by the leased horizontal baler and the <br /> county-owned vertical baler. The horizontal baler will be returned to its owner, saving Orange <br /> County$3,000 each year, and the vertical baler will be modified and installed in our electronics <br /> recycling facility for baling computer plastics. <br /> 3 <br />