Orange County NC Website
ggencies allow a choice between :a'�>Z the tower or <br /> installing strobe lighting_ painting shy be the p= 20 <br /> choice. <br /> 1) The tower and antenna will not <br /> result in a significant adverse impact on the view of or from <br /> any historic site,scenic road,or major view corridor. <br /> m) All abandoned communication towers <br /> shall be removed within 12 months of the cessation of use. <br /> A bond or other security guaranteeing <br /> the removal of the tower in the event that it is abandoned or <br /> unused for a period of 12 months shall be posted. A cost <br /> estimate shall be provided baqual_ified contractor. The <br /> amount of the security shall be 110 percent of the estimate. <br /> The Special Use Permit shalt include a condition that the <br /> electro-maan etic radiation levels maintain compliance with <br /> requirements of the Federal Communication Commission. <br /> T <br /> re arding emission of electromagnetic radiation. Within 30 <br /> days of installation of equipment on the tower_ and within <br /> 30 days of the installation of any additional equipment in <br /> the future. the tower owner shall provide documentation of <br /> emission levels in relation to FCC standards. In addition_ <br /> the tower owner must provide documentation of emission <br /> levels within five working das if so =Q.uested by Orange <br /> Cog=._. Orange Countv_=y makC such requests at my <br /> time_not to exceed four times pgLyear. <br /> 63.1 Principal Uses <br /> Thane stall be no more than one princina_1 use on any zo.ning lot except where: <br /> aL_ r_rt of a Planned Developm=o_r <br /> b) the Parcel is less than 2 acres in sin and non-residential multiple uses are <br /> p=sed within a single papal structure:or <br /> Q One of the uses is an unmanned telecommunication tower subiect to a year- <br /> tyear or other short-term lease. <br /> ¢,18 Administrative Approval of Stealth Tel Mon Towers_ W)_ <br />