Browse
Search
Agenda - 10-01-1996 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 10-01-1996
>
Agenda - 10-01-1996 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 12:49:25 PM
Creation date
11/5/2013 12:49:13 PM
Metadata
Fields
Template:
BOCC
Date
10/1/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 19961001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
NSN ORD-1996-040 Zoning Ordinance Text Amendment - Telecommunication Towers
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j) The color of the tower is of light tone, except to the extent 10 <br /> required by law, so as to minimize its visual impact. <br /> k) The towers will not be artificially lighted unless required by <br /> the FAA, FCC or other federal or state agency. Where such <br /> agencies allow a choice between painting the tower or <br /> installing strobe lighting. n.� ainting_ shall be the preferred <br /> choice. <br /> 1) The tower and antenna will not <br /> result in a significant adverse impact on the view of or from <br /> any historic site, scenic road, or major view corridor. <br /> m) All abandoned communication towers <br /> shall be removed within 12 months of the cessation of use. <br /> A bond or other security guaranteeing <br /> the removal of the tower in the event that it is abandoned or <br /> unused for a Igriod of 12 months shall be posted. A cost <br /> estimate shall be provided by a qualified contractor. The <br /> amount of the security shall be 110 percent of the estimate. <br /> A determination shall be made that the facility and its <br /> eguWment will comply with all fe eral. state and local <br /> emission requirements, and the Special Use Permit shall <br /> include a statement that h facility and its equipment will <br /> comply with all federal, state and local emission <br /> requirements <br /> The SS al Use Permit shall include a condition that the <br /> electro-magngic radiation levels maintain compliance with <br /> rreQ irements of the Federal Communication Commission <br /> regarding emission of electromagnetic radiation. Within 30 <br /> d s of installation of equipment on the tower and within <br /> 36 days of the installation of my additional eQu pment in <br /> the firtnre the tower owner shall provide documentation of <br /> emission levels in relation to FCC standards In addition <br /> the tower owner must provide documentation of emission <br /> levels within five working days if so requested by Orange <br /> o LU Orange Coun-ty may make such requests at any <br /> time,not to exceed four times per year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.