Browse
Search
Agenda - 10-01-1996 - 8f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 10-01-1996
>
Agenda - 10-01-1996 - 8f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2013 12:14:58 PM
Creation date
11/5/2013 12:14:55 PM
Metadata
Fields
Template:
BOCC
Date
10/1/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8f
Document Relationships
Minutes - 19961001
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> 13 <br /> ARTICLE 5-DIMENSIONAL REQUIREMENTS("Yes"indicates compliance: "No" indicates non-compliance) <br /> PLANNING BOARD OF <br /> BOARD EVIDENCE SUBMITTED COMMISSIONERS <br /> FINDINGS TO SUPPORT FINDINGS FINDINGS <br /> Ordinance Requirements <br /> b) Minimum lot width-_UQ ft. _x—Yes No The lot width shown on plan Yes No <br /> is 240 feet. <br /> c) Required front setback-40 ft. _x—Yes No Typical 40-foot front yard Yes No <br /> setback is noted on plan. <br /> d) Required side and rear setbacks- _x—Yes No Typical 20-foot side and rear Yes No <br /> 2,Q ft. yard setbacks are noted on plan. <br /> *e) Maximum building height- _x—Yes No Maximum building height is 25 Yes No <br /> 2.1 ft. feet. The height of the <br /> Library/Arts Building is 32 feet. <br /> Additional front and side setbacks <br /> will be required in accordance with <br /> Article 6.2.1. <br /> Compliance with lot coverage <br /> and development intensity <br /> standards is addressed in <br /> Article 6. <br /> 'Finding affected by modification,PD-1-96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.