Orange County NC Website
ATTACHMENT 4 <br />North Carolina Department of Transportation (NCDOT) <br />Public Transportation Division (PTD) 18 <br />FY15 CommunityTransportation Capital <br />Project Number: <br />PROPOSED PROJECT BUDGET <br />CAPITAL EXPENSES <br />Applicant: ORANGE COUNTY Program Profile:zPT2 <br />/ <br />i <br />/ <br />r, <br />/ <br />i <br />0 <br />/ <br />i <br />���� %� IIIIII�IIIIIIIIII VIII1111 ,,,1111IIIIIIIIIIIIIIIIIIIIIIII 1111 1111IIIIIIIIIIIIIIIIIIIIIIII 1111 1111IIIIIIIIIIIIIIIIIIIIIIII 1111 1111IIIIIIIIIIIIIIIIIIIIIIII 1111IIIIIIIIIIIIIIIII� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII/ IIIIIIIIIIIIIIIII1111IIIIIIIIIIIIIIII����� %������ %, <br />ROLLING STOCK: REPLACEMENT VEHICLES <br />y, <br />G541 <br />35- to 40 -Ft. HD Low Floor Transit Bus <br />(Replacement) -12 yr. Bus Heavy duty $450,000 $0 $0 <br />2010 -EPA diesel bus built as an integral <br />unit. <br />Alternative fuel engine - Hybrid Electric $250,000 $0 $0 <br />Optional Engine - CNG <br />Optional Engine - Natural Gas <br />y, <br />i r . <br />/ <br />r / / <br />G542 / � <br />30- to 35 -Ft. HD Low Floor Transit Bus <br />(Replacement) -10 yr. Bus $410,000 $0 $0 <br />Heavy duty 2010 -EPA diesel bus built as an <br />integral unit. <br />Alternative fuel engine - Hybrid Electric $200,000 $0 $0 <br />Optional Engine - CNG <br />Optional Engine - Natural Gas <br />y, <br />G543 <br />20' Light Transit Vehicle (Replacement) — <br />Body -on- chassis type vehicle (Cutaway van <br />chassis); retaining the van -type cab; $49,000 $0 $0 <br />offering increased headroom and wider <br />body; max. capacity - 13 passengers (irnay <br />be dirliivein w/o CIDIII,,,,,) <br />Bike Rack $1,500 $0 $0 . <br />y, <br />G545 <br />High -top Vehicle (Replacement) - School <br />bus door entry; lowered stepwell; NO III,,,,,IIIIF "IIF; $50,000 $0 $0 <br />maximum capacity -12 passengers. <br />Optional Engine - Diesel $5,000 $0 $0 <br />Page 2 of 21 <br />