Browse
Search
Agenda - 11-05-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 11-05-2013 - Regular Mtg.
>
Agenda - 11-05-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2013 8:48:03 AM
Creation date
11/4/2013 8:47:40 AM
Metadata
Fields
Template:
BOCC
Date
11/5/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 11-05-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> advertise for bid <br /> BOCC Action: Bid Award 12/17/13 12/17/13 <br /> Construction (est. 4 month 1/6/14 5/6/14 <br /> duration) <br /> Grand Opening —first BOCC 6/3/14 6/3/14 <br /> meeting (estimated date) <br /> 1 <br /> 2 <br /> 3 Ken Redfoot said the purpose of tonight's discussion is to get approval for the <br /> 4 schematic design. He reviewed the map of the overall site plan. He said the improvement of <br /> 5 three parking lots is already out for bid. <br /> 6 Ken Redfoot said the next three plans show the main meeting room with different <br /> 7 furniture layouts. He gave a visual overview of these plans. <br /> 8 He said his staff is looking at alternatives for the television production room to better <br /> 9 accommodate necessary production. <br /> 10 Ken Redfoot said two flat screen monitors are being considered for placement on either <br /> 11 side of the dais for better video presentation. <br /> 12 He noted that work will be done to insure there are no acoustic issues in the room. <br /> 13 He gave a detailed description of the dais, which would accommodate all of the <br /> 14 members of the Board. He said it is also large enough to accommodate up to 11 people in the <br /> 15 event of joint meetings. He noted that it has a seven inch rise from the floor elevation, and a <br /> 16 bullet proof panel across the front. He said there is a countertop with area to accommodate <br /> 17 electrical and data hookups hidden behind a cap piece. <br /> 18 Chair Jacobs asked for more explanation regarding the proposed schedule of the <br /> 19 project. <br /> 20 Jeff Thompson said if the schematic design is approved the team would prepare final <br /> 21 design documents over the next two months, before bringing them back for a final look. He <br /> 22 said after this is approved the plan will be put out to market to receive bids before Christmas, <br /> 23 and construction will begin in the winter. The estimated completion date is June of 2014. <br /> 24 Commissioner Pelissier said it is not clear to her where participants for joint meetings <br /> 25 will have a view of a screen. She noted that those elected officials, as well as other participants <br /> 26 will need to have a view of the presentations that are made. <br /> 27 Ken Redfoot said this would need to be examined. He did not realize the importance of <br /> 28 that angle, but this will be considered in the next level of design. <br /> 29 Commissioner Gordon reinforced what Commissioner Pelissier said about the audience <br /> 30 and Board of County Commissioners with regard to the screens and acoustical information. <br /> 31 Commissioner Gordon said she did send out questions via email to staff and the Board. <br /> 32 She requested that these be included as part of the minutes , with staff responses shown <br /> 33 below: <br /> 34 <br /> 35 From: Alice Gordon rmailto:gordon.alicep_gmail.com] <br /> 36 Sent: Monday, September 16, 2013 10:06 AM <br /> 37 To: Barry Jacobs; Bernadette Pelissier; Earl McKee; gordon.alicep_gmail.com; Alice Gordon; <br /> 38 Mark Dorosin; Penny Rich; Donna Baker; Frank Clifton; Greg Wilder; Michael Talbert <br /> 39 Subject: Questions/ comments on Item 7-b <br /> 40 Questions/ comments on item 7-b - Sept. 17, 2013 - Whitted Building <br /> 41 <br /> 42 1. Has the Sheriff reviewed the design from a security point of view? <br />
The URL can be used to link to this page
Your browser does not support the video tag.