Orange County NC Website
JULES COHEN & ASSOCIATES, P.C. <br /> CONSULTING ENCINSBRS 43 <br /> WASHINGTON, D.C. 20036 <br /> Engineering Statement Page 7 <br /> Cantoro, North Carolina <br /> results in no increase in the exposure levels present at the site. Because exposure levels are a <br /> function of effective radiated power, antenna electrical characteristics, and distance between the <br /> antenna and observer, it is quite reasonable to assume that there will be no change in the ground <br /> level exposure as long as there is no change in effective radiated power, antenna type, or antenna <br /> mounting height above ground level. If future measurements at this site are to-be made to verify <br /> compliance with the standards, such measurements should only be required if maximum effective <br /> radiated power is increased, a transmitting antenna changed or added, or transmitting antenna <br /> height is changed more than six feet. The addition or relocation of a receiving antenna should <br /> not require a new field strength survey. <br /> Robert W. Denny, Jr4P.E. <br /> June 13, 1994 <br />