Browse
Search
Agenda - 09-03-1996 - X-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 09-03-1996
>
Agenda - 09-03-1996 - X-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2013 4:25:38 PM
Creation date
10/30/2013 4:25:35 PM
Metadata
Fields
Template:
BOCC
Date
9/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-B
Document Relationships
Minutes - 19960903
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> STATUS OF ORANGE COUNTY'S PRIORITY LIST PRESENTED TO THE BOARD OF <br /> TRANSPORTATION ON NOVEMBER 15, 1995 <br /> PROJECTS WITHIN THE DCHC PLANNING AREA: <br /> I. U-2805: Homestead Road Widening - The project construction was changed from the <br /> beginning of 2002 to the middle of 2001. SOURCE: 1997-2003 STIP <br /> H. I-305: wideniniof I-85 to six lanes and reconstruction of interchanges from Orange <br /> Grove Road to Durham County Line - This project is still listed as an "Identified Future <br /> Need" with no scheduled dates for planning or construction. SOURCE: 1997-2003 STIP <br /> III. I-3306 SECTION A: widening of I-40 to six lanes from I-85 in Orange County to US <br /> 15-501 in Durham County- This project is still scheduled for construction to begin in <br /> 2001. SOURCE: 1997-2003 STIP <br /> IV: R-2630 DURHAM NORTHWEST LOOP (ENO DRIVE): new multi-lane route from I- <br /> 85 in Orange County to I-85 in Durham Cgm=-This project is listed as an "Identified <br /> Future Need" with no scheduled dates for planning or construction. SOURCE: 1997- <br /> 2003 STIP <br /> V: NC 86: construct bicycle lanes -This project is not currently scheduled for planning or <br /> construction. SOURCE: Pat Puglisi, NCDOT <br /> PROJECTS OUTSIDE THE DCHC AREA: <br /> I. I-304: widening of I-85 to eight lanes and reconstruction of interchanges from NC 54 (in <br /> Alamance County)to Dimmocks Mill Road -This project is under construction and <br /> projected to be completed in the early part of 1997. SOURCE: 1997-2003 STIP <br /> H. Transit Improvements- <br /> a) Twenty Year Transit Development Plan for Orange County-This project is not - <br /> currently scheduled for funding. SOURCE: Mike Kozac,NCDOT <br /> b) Park and Ride Lot north of the Town of Hillsborough on NC 86 -This project has the <br /> possibility of discretionary funding, but awaits clarification from Carol Carter, NCDOT. <br /> c) Bus-Turn-Outs-on both sides-of NC 86-at the-Orange County Northern-Human - _ <br /> Services Center-This project has the possibility of discretionary funding, but awaits <br /> clarification from Carol Carter,NCDOT. <br /> III. Bicycle Improvements- <br /> a) Orange County Bicycle Route Map- See attached April 15, 1996 letter from Tom <br /> Norman,NCDOT. <br /> b) Bicycle Safe Bridge Railings- See attached April 15, 1996 letter from Tom <br /> Norman,NCDOT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.