Browse
Search
Agenda - 09-03-1996 - X-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 09-03-1996
>
Agenda - 09-03-1996 - X-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2013 4:25:38 PM
Creation date
10/30/2013 4:25:35 PM
Metadata
Fields
Template:
BOCC
Date
9/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-B
Document Relationships
Minutes - 19960903
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> l <br /> local transit planning with the Triangle Fixed Guideway Study <br /> recommendations. Orange County again requests that the NCDOT <br /> Public Transportation and Rail Division develop a Twenty Year <br /> Transit Development Plan for Orange County. <br /> Orange County also requests the following specific transit related <br /> improvements: <br /> a) Park and Ride Lot north of the Town of Hillsborough on NC 86. <br /> b) Bus Turn Outs on both sides of NC 86 at the Orange County <br /> Northern Human Services Center. <br /> III) Bicycle Improvements - Orange County is performing Suitability <br /> Analyses on the Durham-Chapel Hill-Carrboro MPO' s Regional Bicycle <br /> Plan and has identified the following needed bicycle improvements: <br /> a) Orange County Bicycle Route Map - This map should be <br /> comprehensive in nature and have all the rural Orange County <br /> bicycle routes, include insets of the bicycle routes for the <br /> Towns of Hillsborough, Carrboro, Chapel Hill and also the <br /> University of North Carolina. <br /> b) Bicycle Safe Bridge Railings - It is imperative that 54" high <br /> bicycle railings be installed on each of the overpasses along <br /> the adopted bicycle routes over I-85 and I-40. Bicyclists <br /> are riding these routes in increasing numbers and the narrow <br /> width of the bridges contributes to an already hazardous <br /> condition. <br /> Thank you for your consideration of these requests. <br /> Submitted this 15th day of November, 1995 <br /> ORANGE COUNTY BOARD OF COMMISSIONERS <br /> by: <br /> Moses Carey, Jr. , a' <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.