Orange County NC Website
2 <br /> cubic yard dump truck loads to and through the site; and 5)using a track <br /> loader to push fill material into the pit and spread the material along the <br /> bottom of the pit. <br /> This proposed first phase of the fill operation will provide only about 650 <br /> cubic yards to a project that will eventually require more than 10,000 cubic <br /> yard of fill. However, this phase will establish the site access for future <br /> phases. The fill material,which is excess earth and rock material from a <br /> construction site in the Meadowlands, will be loaded and transported at the <br /> cost of the construction project owner. The cost of constructing the access <br /> across County property and placing/spreading the material in the borrow pit <br /> will be paid from a Town of Hillsborough fund created especially for that <br /> purpose. <br /> RECOMAMNDATION : The County Manager recommends that the BOCC approve this phase <br /> of the plan to fill the borrow pit within the planned Eno Riverfront <br /> park. <br />