Browse
Search
Agenda - 09-03-1996 - VIII-L
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 09-03-1996
>
Agenda - 09-03-1996 - VIII-L
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2013 3:44:56 PM
Creation date
10/30/2013 3:44:56 PM
Metadata
Fields
Template:
BOCC
Date
9/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-L
Document Relationships
Minutes - 19960903
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGECOUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 3, 1996 <br /> Action Agenda <br /> Item# . <br /> SUBJECT: Eno Riverfront/County Campus Park Construction Activities <br /> DEPARTMENT: County Manager PUBLIC HEARING: Yes No <br /> ATTACHMENT(S): BUDGET AMENDMENT: Yes No <br /> None INFORMATION CONTACT: <br /> County Engineer Extension 2303 <br /> TELEPHONE NUMBERS: <br /> Hillsborough - 732-8181 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 967-9251/968-4501 <br /> PURPOSE: To provide the BOCC with information regarding proposed construction activities <br /> related to placing earth and rock fill in the existing"borrow pit" area within the <br /> planned Eno Riverfront park in the County's Hillsborough campus area. <br /> BACKGROUND: At the BOCC-Hillsborough Town Commissioners regular quarterly meeting <br /> of 13 March 1996, an Eno Riverfront/County campus park report was <br /> presented to Town and County elected officials. The substance of the report <br /> dealt with the proposed master plan for the park, park structures and the <br /> draining and filling of the existing"borrow pit" located in the south east <br /> comer of the park. In accordance with the discussion of that meeting, <br /> individuals active in the park development process have proposed to begin <br /> the process of filling the borrow pit. The specific proposal involves: <br /> a) opening a haul route/equipment access way across County property <br /> between the unpaved southern end of Cameron Street and the borrow pit; <br /> and b)hauling fill material to and spreading fill material in the borrow pit. <br /> The actual construction activities proposed for this phase of the fill operation <br /> will involve: 1) removing an approximately twenty feet wide section of trees <br /> along Cameron Street; 2) constructing a section of gravel surfaced access <br /> drive(to reduce the transportation of mud and dirt from the access drive to <br /> Cameron Street); 3)removing an approximately sixty feet wide section of <br /> trees along the rim of the borrow pit;4)hauling approximately sixty five ten <br />
The URL can be used to link to this page
Your browser does not support the video tag.