Browse
Search
Agenda - 09-03-1996 - VIII-F
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 09-03-1996
>
Agenda - 09-03-1996 - VIII-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2013 3:08:46 PM
Creation date
10/30/2013 3:08:44 PM
Metadata
Fields
Template:
BOCC
Date
9/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-F
Document Relationships
Minutes - 19960903
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
NSN ORD-1996-032 Proposed Subdivision Regulation Text Amendment Section III-C-4 and III-D-3-c Action Subsequent to Approval
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 t <br /> provided the applicant can demonstrate a good faith effort to comply with the <br /> deadline,but for reasons beyond his/her control, fails to meet the requirements <br /> for recordation within that period. All such plats shall conform to drawing <br /> specifications and certification requirements for Final Plats contained in <br /> Section V-D,of this Ordinance. <br /> Recordation of the approved final plat, and auxiliary documentation as <br /> required in the conditions of preliminary plat approval shall be done in the <br /> pr-esenee-ef an with the advice and consent of the Planning Department. <br /> DepaFtfneat by ay be r-eeefded oft the Same day. <br /> III-C-3-c: Action Subsequent to Approval (major subdivision) <br /> If the application is approved or approved with conditions,the Planning <br /> Director or his/her designated representative shall endorse his/her approval on <br /> a reproducible mylar original of the Final Plat. The applicant shall record the <br /> Final Plat in the Office of the Register of Deeds within ninety (94)days after <br /> the Planning Director's endorsement of approval. If such plat is not recorded <br /> within the specified time period,the Final Plat is void. The Planning Director <br /> may extend the time period,provided the applicant can demonstrate a good <br /> faith effort to comply with the deadline,but for reasons beyond his/her <br /> control, fails to meet the requirements for recordation within that period. All <br /> such plats shall conform to drawing specifications and certification <br /> requirements for Final Plats contained in Section V-D of this Ordinance. <br /> Recordation of the approved final plat, and auxiliary documentation as <br /> required in the conditions of preliminary plat approval shall be done in the <br /> pFesenee-e€ with the advice and consent of the Planning Department. <br /> Ploming DepaMneat b5-4"O a.m. owy be Feserded en the same day. <br /> Ordinance Review Committee: April 4, 1996 <br /> Planning Board: <br /> BOCC: <br />
The URL can be used to link to this page
Your browser does not support the video tag.