Browse
Search
Agenda - 08-26-1996 - C4a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 08-26-1996
>
Agenda - 08-26-1996 - C4a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2013 12:40:00 PM
Creation date
10/30/2013 12:39:53 PM
Metadata
Fields
Template:
BOCC
Date
8/26/1996
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 4a
Document Relationships
Minutes - 19960826
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
091 <br /> extension of its expiration date, or until such time as this permit is otherwise changed by <br /> governmental action. <br /> The conditions of approval of the Special Use Permit are as follows: <br /> 1. The sewage disposal system must at all times be operated and maintained <br /> according to the standards and conditions set forth by the NC Division of <br /> Environmental Management in Permit WQ0002161 and as may be amended in <br /> the future. <br /> 2. Maintain screening along the eastern boundary line to screen parking areas and <br /> dumpsters to meet the landscape requirements of Article 12.4 of the Orange <br /> County Zoning Ordinance. <br /> 3. With applications for building permits, provide documentation of how the <br /> proposed construction will access the existing sewage disposal system as well as <br /> estimates for any increase in daily flow through the system. Each application <br /> which will create additional demand on the system must be accompanied by an <br /> approval letter from the Division of Environmental Management. All <br /> information will be submitted to the County Engineer for review to determine <br /> that the system demand does not exceed 4000 gallons per day. No building <br /> permits will be approved for additions/renovations without prior approval from <br /> DEM and approval of an amendment to this Special Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.