l <br /> MEMORANDUM 17 <br /> TO: Mary Willis, Planner III <br /> FROM: Paul Thames, PE, County Engineer <br /> DATE: June 6, 1996 <br /> SUBJECT: Cost estimate for sewer extension from Efland sewer system to Buckhorn EDD <br /> As per our discussions of the past months, I have developed a cost estimate for the construction of the <br /> major portion of the sewer system network which would be required to serve the extended Buckhorn <br /> EDD. By the extended EDD, I mean a district which would He on both the north and south sides of I-85. <br /> My fundamental sewer layout proposal assumes a design which would include: 1) a wastewater pumping <br /> station located near the intersection of Three Mile Branch(1891 Tate map designated name for Seven <br /> Mile Creek tributary) and Old NC 10; 2) a six inch force main extending from the pump station <br /> northward cross-country under the railroad and Hwy 70 to the western-most point of the gravity section <br /> of the Efland sewer system(a manhole lying in the northern right-of-way of Hwy 70 just east of <br /> Redmond Road); 3) a series of six eight inch diameter gravity sewer collector lines extending from the <br /> pumping station to the west, north west and north along the tributaries to Three Mile Branch. Four of <br /> the gravity sewer collectors would be extended under Interstate 85 to just south of the railroad. One <br /> collector would extend to just south of I-85 and the last collector would be extended almost due west to <br /> near Buckhorn Road. <br /> The proposed layout is shown on the attached scan of a map of Orange County. Before scanning, the <br /> map scale was 1" =4000' but, as the scanned version was enlarged during the photocopying process <br /> prior to scanning, its current scale is not known. It is possible that cumulative sewer line quantities <br /> acquired by doing a quantity take-off from such a small scale drawing could be in error by as much as <br /> ` 1000 feet. In any event, I have derived a total construction cost estimate of$2,000,000 to $2,500,000. <br /> That estimate, at least the low end, is broken down as follows: <br /> 8" gravity sewer line DIP (ductile iron pipe) 20,000 linear feet @ $50.00 per foot = $ 1,000,000 <br /> 6" force main DIP 5000 linear feet @ $25.00 per foot = $ 125,000 <br /> 16" steel bore casing(hwy crossing) 1200 linear feet @ $100 per foot = $ 120,000 <br /> 12" steel bore casing <br /> (hwy and railroad crossing) 150 linear feet @ $80 per foot = $ 12,000 <br /> 300,000 gpd(gallons per day)pump station <br /> with standby power generation 1 @ lump sum - = $ 150,000 <br /> Miscellaneous clearing, grubbing, seeding, <br /> erosion control, mobilization 1 @ lump sum = $ 150,000 <br /> Engineering, surveying, easements, legal, <br /> administrative, contingencies 1 @ lump sum(+/-25%) = $ 443,000 <br /> Total Estimated project costs $ 2,000,000 <br /> If I may provide additional information or clarification, please advise. <br />