Orange County NC Website
Irerracon <br /> COST ESTIMATE <br /> MATERIALS TESTING SERVICES <br /> MEBANE EDD WATER/SEWER <br /> MEBANE,NORTH CAROLINA <br /> TERRACON PROPOSAL:P70130248 <br /> Trips/ Unit <br /> Type of Services/Testing Samples Hrs/Trip Rate Units cost <br /> Soils/Foundations <br /> Field Technician 82 4 $40.00 hour $13,120.00 <br /> Standard Proctor Compaction Test 10 X $160.00 each $1,600.00 <br /> Atterberg Limits Test 10 X $95.00 each $950.00 <br /> Percent Fines 10 X $75.00 each $750.00 <br /> Nuclear Density Gauge 80 X $35.00 trip $2,800.00 <br /> Trip Charges 80 X $0.00 trip $0.00 <br /> Subtotal $19,220.00 <br /> Concrete Testing <br /> Field Technician 5 4 $40.00 hour $800.00 <br /> Concrete cylinder lab testing(5 cyl/set) 25 X $14.00 each $350.00 <br /> Trip Charges 5 X $0.00 trip $0.00 <br /> Subtotal $1,150.00 <br /> Asphalt Testing <br /> Coring Crew 2 4 $105.00 hour $840.00 <br /> Asphalt Core Testing 6 X $25.00 each $150.00 <br /> Trip Charges 2 X $0.00 trip $0.00 <br /> Subtotal $990.00 <br /> Engineering Review/Reports <br /> Senior Project Manager(reports and review) 32 X $95.00 hour $3,040.00 <br /> Project Engineer(review) 16 X $115.00 hour $1,840.00 <br /> Clerical 32 X $45.00 hour $1,440.00 <br /> Subtotal $6,320.00 <br /> Total Estimate: $27,680.00 <br />