Orange County NC Website
E( HIBIT A <br /> FORM OF CONSTRUCTION CON'T'RACT - EAIQNS PLUMBING CO. <br /> ORANGE COUNTY SOUTHERN HUMAN SERVICES CENTER <br /> The following revisions are made to the scope of work defined by the bid documents and shall be <br /> documented in revised drawings to be provided by the Owner prior to work commencing on the <br /> affected items. <br /> ITEM DESCRIPTION COST ADIUSTMENT <br /> 1. Utilize PVC piping and fittings throughout for <br /> waste, vent, and roof leaders DEDUCT: $ 6,422 <br /> 2. Utilize a less expensive fixture package based on <br /> information from Ferguson Enterprises, received 6/14/96, <br /> with changes to water closets and janitor's sinks <br /> provided 6/26/96 DEDUCT: 2.394 <br /> TOTAL ADJUSTMENTS: DEDUCT: 8,816 <br /> AMOUNT OF BASE BID: $110,000 <br /> TOTAL CONTRACT AMOUNT: $101,184 <br />