Orange County NC Website
EXHIBIT A <br /> FORM OF CONSTRUCTION CONTRACT - COMFORT ENGINEERS <br /> ORANGE COUNTY SOUTHERN HUMAN SERVICES CENTER <br /> The following revisions are made to the scope of work defined by the bid documents and shall be <br /> documented in revised drawings to be provided by the Owner prior to work commencing on the <br /> affected items. <br /> ITEM DESCRIPTION COST ADTUSTMENT <br /> 1. Change to DX rooftop units, still VAV with variable <br /> frequency drives, and eliminate the chilled <br /> water systems DEDUCT: $ 43,939 <br /> 2. Change from multiple boilers to single cast-iron boiler DEDUCT: 9,898 <br /> 3. Go to rectangular shop-fabricated medium-pressure duct, <br /> in lieu of spiral DEDUCT: 4,389 <br /> 4. Utilize conventional pneumatic control system for the <br /> VAV boxes only, and DDC on the remaining <br /> equipment DEDUCT: 7,500 <br /> 5. Eliminate Meeting Room 019, Corridor 014 in south <br /> entrance to Multipurpose Room DEDUCT: 3,135 <br /> 6. Reduce the size of Breakroom 039, Corridor 002, and <br /> Corridor 003; relocate the Sheriff's Office <br /> and Meeting Room 018 north of the H and CD offices DEDUCT: 552 <br /> TOTAL ADJUSTMENTS: DEDUCT: 69,413 <br /> AMOUNT OF BASE BID: $518,850 <br /> TOTAL CONTRACT AMOUNT: $449,437 <br />