Browse
Search
1996 S Purchasing - Comfort Engineers for SHSC Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1996
>
1996 S Purchasing - Comfort Engineers for SHSC Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 11:40:04 AM
Creation date
10/25/2013 9:32:16 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1996
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-D
Document Relationships
Agenda - 06-03-1996 - IX-D
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1996\Agenda - 06-03-1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL SIGNATURES <br /> COPY <br /> FORM OF CONSTRUCTION CO T"T' <br /> jam=)MULTI-PRIME MECHANICAL CONSTRUCTION <br /> THIS AGREEMENT, made the 25th day of June in <br /> the year of 1996 by and between Comfort Engineers <br /> Durham, NC <br /> hereinafter called the Party , of the First Part and XKKbXXS �X <br /> =r12YXXk'Z0 4XXt tt the County of Orange, Hillsborough, North Carolina. <br /> hereinafter called the Party of the Second Part. <br /> WITNESSETH: <br /> That the Party of the First Part and the Party of the Second Part for the consideration <br /> herein named agree as follows: <br /> 1. Scope of Work: The Party of the First Part shall furnish and deliver all of the <br /> materials, and perform all of the work in the manner and form as provided by the following <br /> enumerated plans, specifications and documents, which are attached hereto and made a part <br /> thereof as if fully contained herein: advertisement; Instructions to Bidders; General <br /> Conditions; Supplementary General Conditions; specifications; accepted proposal; contract; <br /> performance bond; payment bond; power of attorney; workmen's compensation; public <br /> liability; property damage and builder's risk insurance certificates; xppMVt7 <br /> � tffae and drawings, titled: <br /> "Orange County Southern Human Services Center, Chapel Hill, NC", <br /> as modified by "Exhibit A", attached hereto. <br /> Consisting of the following sheets: See pages 00020-2 and 00020-3 of <br /> Specifications. <br /> Dated: February 23, 1996 and the following addenda: <br /> Addendum No. 1 Dated 3/19/96 Addendum No. Dated <br /> Addendum No. 2 Dated 3/20/96 Addendum No. Dated <br /> Addendum No. 3 Dated 3/21/96 Addendum No. Dated <br /> Addendum No. Dated Addendum No. Dated <br /> 2. That the Party of the First Part shall commence work to be performed under this <br /> agreement on a date to be specified in a written order of the Party of the Second Part and shall <br /> _ fully complete all work hereunder within _ 425 -- consecutive calendar days <br /> from said date. For each day in excess thereof, liquidated damages shall be as stated in <br /> Supplementary General Conditions. The Party of the First Part, as one of the considerations <br /> for the awarding of this contract, has furnished to the Party of the Second Part a construction <br /> schedule setting forth pplanned progress of the project broken down by the various divisions or <br /> part of the work and by calendar days. If the Party of the First Part fails to begin the work <br /> under the contract within the time specified, or the progress of the work is not maintained on <br /> schedule, or the work is not completed within the time above specified, or fails to perform the <br /> work with sufficient workmen and equipment or with sufficient materials to ensure the prompt <br />
The URL can be used to link to this page
Your browser does not support the video tag.