Browse
Search
1996 S Purchasing - D H Griffin -General Contractor SHSC Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1996
>
1996 S Purchasing - D H Griffin -General Contractor SHSC Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 11:41:08 AM
Creation date
10/25/2013 9:24:38 AM
Metadata
Fields
Template:
BOCC
Date
6/3/1996
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-D
Document Relationships
Agenda - 06-03-1996 - IX-D
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1996\Agenda - 06-03-1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> FORM OF CONSTRUCTION CONTRACT - D. H. GRIFFIN CONSTRUCTION CO.,LLC <br /> ORANGE COUNTY SOUTHERN HUMAN SERVICES CENTER <br /> The following is a breakdown of cost for modifications from the bid documents. These <br /> modifications from the bid documents are described below and/or shown on the revised contract <br /> documents dated revision 1 (06-28-96). <br /> 1) Eliminate curb and gutter at the parking area and provide concrete wheel stops (detail 19/C5 <br /> without "flow slots") at all parking spaces. Pavement markings at entrance drive will be with <br /> standard paint in lieu of thermoplaster. <br /> Deduct $16,700 <br /> 2) Grading change: Lower the building pad elevation and revise grading($43,000), storm <br /> drainage ($1,560), unit pavers ($1,200), and height of east retaining wall to T-4" ($4,000). <br /> In reference to revised grading, it is the intent of the revised contract documents to balance the <br /> site by lowering the building's finished floor elevation by 2.5' and to provide an on-site excavation <br /> area in an open field adjacent to the building. It is also the intent to eliminate the need for any <br /> off-site fill material. <br /> Deduct $49,760 <br /> 3) Reduce landscape materials, equipment and installation cost by revising landscaping sheets L-1 <br /> and L-2 as follows: <br /> Downsize: Abelia 5 gallon to 3 gallon <br /> Helleri 5 gallon to 3 gallon <br /> Wax Myrtle 7 gallon to 5 gallon <br /> Change: Armstrong Red Maple to Red Maple <br /> Neilie Stevens Holly to Greenleaf or Savannah. <br /> Delete: All 2" Hedera Helix, change to seeding. <br /> One London Plane Tree <br /> Deduct $13,440 <br /> 4) Reduce extent of foundation drainage <br /> Deduct $9,000 <br /> 5) Eliminate screenwalls, fencing and operable gate at service court. <br /> Deduct $72,800 <br /> 6) Delete screenwall and pad at chiller <br /> Deduct $5,500 <br /> 7) Reduce length of entrance canopy <br /> Deduct $12,900 <br /> 8) Revise floor plan <br /> Deduct $34,230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.