Orange County NC Website
- -� <br /> -7/ <br /> ORIGINAL SIGNATURES <br /> COPY <br /> s FORM OF CONSTRUCTION CONTRARIST: <br /> ! (AIMXAV,1 MXMV ) MULTI-PRIME GENERAL CONSTRUCTION <br /> THIS AGREEMENT, made the 25th day of June in <br /> the year of 1996 by and between 13.H.i Griffin Construction Co. , LLC <br /> hereinafter called the Party of the First Part and the SxYaf <br /> }N=t�h�cxruwc)zt9.,im xxthruughcx:th�u County of Orange, Hillsborough, North Carolina <br /> hereinafter called the Party of the Second Part. <br /> WITNESSETH: <br /> That the Party of the First Part and the Party of the Second Part for the consideration <br /> herein named agree as follows: <br /> 1. Scope.of Work: The Party of the First Part shall furnish and deliver all of the <br /> materials, and perform all of the work in the manner and form as provided by the following <br /> enumerated plans, specifications and documents, which are attached hereto and made a part <br /> thereof as if fully contained herein: advertisement; Instructions to Bidders; General <br /> Conditions; Supplementary General Conditions; specifications; accepted proposal; contract; <br /> performance bond; payment bond; power of attorney; workmen's compensation; public <br /> liability; property damage and builder's risk insurance certificates; ate' xotxattoA <br /> �r, by,#� Sget �sn�, and drawings, titled: <br /> 'orange County Southern Human Services Center, Chapel Hill, NC' <br /> as modified by "Exhibit A", attached herein_ <br /> Consisting of the following sheets: See pages 00020-2 and 00020-3 of <br /> Specifications <br /> Dated: February 23, 1996. and the following addenda: <br /> Addendum No. 1 Dated 3/19/96 Addendum No. Dated <br /> Addendum No. 2 Dated 3/20/96 Addendum No. Dated <br /> Addendum No. 3 Dated 3/21/96 Addendum No. Dated <br /> Addendum No. Dated Addendum No. Dated <br /> 2. That the Party of the First Part shall commence work to be performed under this <br /> agreement on a date to be specified in a written order of the Party of the Second Part and shall <br /> fully comnplete all work hereunder within 425 _ consecutive calendar days <br /> from said date. For each day in excess ereo , qui ate damages shall be as stated in <br /> Supplementary General Conditions. The Party of the First Part, as one of the considerations <br /> for the awarding of this contract, has furnished to the Party of the Second Part a construction <br /> schedule setting forth pplanned progress of the project broken down by the various divisions or <br /> part of the work and by calendar days. If the Party of the First Part fails to begin the work <br /> under the contract within the time specified, or the progress of the work is not maintained on <br /> schedule, or the work is not completed within the time above specified, or fails to perform the <br /> work with sufficient workmen and equipment or with sufficient materials to ensure the prompt <br />