Orange County NC Website
a 7 <br /> LAW OFFICES <br /> COLEMAN, GLEDHILL & HARGRAVE <br /> A PROFESSIONAL CORPORATION GEOFFREY E.GLEDHI L <br /> DOUGLAS HARGRAVE <br /> 129 E.TRYON STREET <br /> P.O.DRAWER 1529 KIM r-� � <br /> HILLSBOROUGH,NORTH CAROLINA 27278 JANET B.DUTTON <br /> (919)732.2196 DOUGLAS P.THOREN <br /> FAX(919)732.7997 SAMUEL ELY OOLEMAN <br /> December 18, 1995 <br /> Mr. Marvin Collins <br /> Planning Director <br /> Orange County Planning Department <br /> Post Office Box 8181 <br /> Hillsborough, North Carolina 27278 <br /> RE: Special Use Permits <br /> Dear Marvin: <br /> While recently reviewing a special use permit or two, it <br /> occurred to me that Orange County should condition its special <br /> use permits such that if any condition is determined to be <br /> invalid, the whole permit is invalid. I think it will also be <br /> useful if special use permits describe the construction timing <br /> requirements of the Ordinance as a condition of approval. I <br /> recommend the following language be used and that each special <br /> use permit approval be conditioned as follows: <br /> # If any of the conditions affixed hereto or any- part of this <br /> permit shall be held invalid or void, then this permit shall <br /> be void and of no effect. <br /> # This permit shall automatically expire within twelve (12) <br /> months of the date of its approval if the use has not <br /> commenced or construction has not commenced and proceeded <br /> unless a timely application for extension of this time limit <br /> is approved by the Board of County Commissioners as. provided <br /> for in Section 8.4. 11 of the Orange County Zoning Ordinance. <br /> These conditions are fairly standard for special use <br /> permits. At some point in time I have talked about their need <br /> with you or perhaps some members of your staff. I had overlooked <br /> documenting those conversations and providing the needed <br /> language. <br />