Browse
Search
Agenda - 06-03-1996 - VIII-G
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 06-03-1996
>
Agenda - 06-03-1996 - VIII-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2013 4:49:36 PM
Creation date
10/24/2013 4:49:29 PM
Metadata
Fields
Template:
BOCC
Date
6/3/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-G
Document Relationships
1996 S Contract Orange Co - US Equal Employment Opportunity Commission $51,700
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1996
Minutes - 19960603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> U.S. EQUAL EMPLOYMENT OPPORTUNITY COMMISSION <br /> UNIFORM CONTRACT FORMAT <br /> SECTION F - DELIVERIES OR PERFORMANCE <br /> F.1 PERIOD OF PERFORMANC9 <br /> Performance under this contract shall begin on October 1, 1995 and be completed by <br /> September 30, 1996. <br /> F.2 TIME OF DEUvERY1DWvERABLES <br /> A. Where the Contractor is on the EEOC's computerized charge data system (FEPA COS): <br /> 1. The contractor must make accurate and timely charge data entries in the FEPA COS, <br /> and is responsible for ensuring that all appropriate charge information is available for <br /> extraction by the Collection Manager in a timely manner. Charge resolutions <br /> submitted for contact credit review will not be accepted for payment if it is <br /> determined that any required data entry has not been made by the FEPA. A <br /> determination not to award contract credit made may be reversed under the <br /> procedures set forth in Section 11.6.5.a. of the FY 1996 Contracting Principles. <br /> 2. In addition, in order for a charge to be eligible for contract credit, basic charge data <br /> must be entered into the FEPA COS within five days of the Contractor's receipt of <br /> each charge. <br /> 3. In order to meet the requirement in the FY 1996 Contracting Principles at Section <br /> 11.8.2. that the Contractor shall provide EEOC with a list of final actions within a <br /> timeframe agreed upon by the Contract Monitor and the Contractor, but no later than <br /> 30 days after the resolution of each charge, the Contractor must ensure the timely <br /> and accurate entry of data into the FEPA COS. The Contractor Monitor, will generate <br /> charge data lists and reports through the FEPA COS to verify that this requirement is <br /> being met throughout the term of this contract. <br /> 4. The Contractor will enter all charge data for contract credit submissions through each <br /> quarter not later than the 8th calendar day of the month following each quarter. <br /> F-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.