Orange County NC Website
115 <br /> ,Mh t�As-req eat-A bond or other security gu?ranteeing <br /> the removal of the tower in the event that it is abandoned or <br /> un1CPd for a 1e*i^d of 12 months shall be posted. A cost <br /> estimate shall be vrovided by a clified contractor. The <br /> amount of the security shall be 110 percent of the estimate <br /> 6.3.1 Principal Uses <br /> Thch shall be no more dion 0 nom 1,use g let 4t a eptie r <br /> Y _'Y �� „a �' r <br /> Y single pFiaeipeA <br /> cac leeated on <br /> There shall be no more than one p n icip la use on n zy onin_g lot except where: <br /> a) I&nnitted as wart of a Planned Development:or <br /> b) the parcel is less than 2 acres in size and non-residential multiple uses are <br /> proposed within a single principal structure:or <br /> C) One of the uses is an nn*nannPrl telecommunication tower subject to a year- <br /> to-year or other short-term lease. <br /> 518 Administrative Approval of Stealth Telecommunication Towers MMO <br /> New telecommun. tion towers = to 160 feet in-height which are sufficiently <br /> disa i sed so as to minimize visual i=act may he approved administratively by <br /> the Planning_Staff� provided that all of the provisions contained in Article 8 8 17a <br /> are met. A new tower may be considered sufficiently disguised if: the primary_ <br /> 12=9se of the structure is, or visually apl& to be something other than the <br /> m=rt of telecom_mu_nications equipment: the apparent 12u=se is customarily <br /> considered as accessory to a use which is allowed in the zoning district' and the <br /> structure and its use comply with the Orange County Zoning Ordinance <br /> The placement of telecommunication equipment on existing stnlcb=s may be <br /> approved a mi istratively=provided that the equipment does not extend more than <br /> 20 feet above the stmcturz, or 10% of the height of the structure- whichever is <br /> gmater. and height and setback limitat onS of the Zoning Ordinance are met <br />